SHN: Quarterly Activities Report
Original announcement by asx on
- Company
- Sunshine Metals Ltd
- Ticker
- SHN
- Exchange
- ASX
- Region
- Queensland
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Resource update, Other, Drill results
- Extracted
- 2026-10-29 22:18:48 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Sunshine Metals has announced an updated Mineral Resource Estimate for its Liontown project, now totaling 7.3Mt at 3.2g/t AuEq, and an updated Mining Study outlining a production target of approximately 80Koz gold and 952Koz silver from a multi-staged open pit and underground operation. New RC drill results from the Sybil project confirm extensions to gold mineralisation, including 4m at 11.11g/t gold. The company is also advancing the refurbishment of the Mt Moss processing facility and has made new board and management appointments.
Reasoning: The quarterly report presents significant updates to the Liontown resource and a positive economic study, alongside new drill results from Sybil that extend mineralisation. While some grade dilution is noted in the overall resource, contained metal increased, and the Gold Study Resource showed strong growth. The Mining Study outlines robust economics, and project development is progressing. Drill results are mixed but include strong intercepts.
Positive factors
- Significant increase in contained gold and silver for the Liontown Gold Study Resource
- Overall Liontown resource shows contained metal growth despite grade dilution
- Updated Mining Study outlines robust economics and production targets
- New drill results confirm gold mineralisation extensions at Sybil with high-grade intercepts
- Project development and environmental approvals are well advanced for Liontown
- Mt Moss processing facility refurbishment is on track for commissioning
Negative factors
- Overall Liontown resource shows a decrease in average grade, indicating dilutive growth
- Many Sybil drill intercepts are below the project's historical average grade
- Drill results do not state true width, implying apparent width only
Facts used in scoring: 60

Extracted facts
Stored fact records: 60. Some facts used in scoring do not have a stored record.
Drill Results (14)
26FCRC031Sybil · goldGrade: 11.11Grade Unit: g/tIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- 26FCRC031
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 11.11
- Grade Unit
- g/t
- Intercept
- 4 m
- From
- 62 m
- To
- 66 m
- Intercept Depth
- 62 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC031:62-66
Location
- Location
- Francis Creek, A Vein
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This high-grade intercept at Sybil is a strong result, exceeding the project's average grade and contributing positively to the exploration program, though true width is not provided.
Positive factors
- High-grade intercept (11.11 g/t Au) is well above project average (9.452 g/t Au)
- Good grade-thickness product (44.44 g/t*m) for an epithermal deposit
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Apparent width only, true width not stated
Evidence · text
“4m @ 11.11g/t Au from 62m (26FCRC031)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“4m @ 11.11g/t Au from 62m”
Infill DrillingRejected · neutral
Confirmatory drilling to raise resource confidence, not new discovery.
Reason: The drilling program aimed to tighten drill spacing to support future resource classification for the A Vein.
Evidence · text
“The A Vein drilling tightened drill spacing to 15m-20m spaced holes to support future resource classification.”
26FCRC031Sybil · goldGrade: 20.22Grade Unit: g/tIntercept: 2 mView all detailsHide details
Identity
- Hole ID
- 26FCRC031
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 20.22
- Grade Unit
- g/t
- Intercept
- 2 m
- From
- 62 m
- To
- 64 m
- Intercept Depth
- 62 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC031:62-64
Location
- Location
- Francis Creek, A Vein
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This exceptional high-grade sub-interval at Sybil is a very strong result, well above the project's average grade, though true width is not provided.
Positive factors
- Exceptional high-grade intercept (20.22 g/t Au) significantly above project average (9.452 g/t Au)
- Strong grade-thickness product (40.44 g/t*m) for an epithermal deposit
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Apparent width only, true width not stated
Evidence · text
“2m @ 20.22g/t Au from 62m”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: The grade of 20.22 g/t Au is well above the exceptional threshold of 5 g/t Au for epithermal gold deposits.
Evidence · text
“2m @ 20.22g/t Au from 62m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“2m @ 20.22g/t Au from 62m”
Infill DrillingRejected · neutral
Confirmatory drilling to raise resource confidence, not new discovery.
Reason: The drilling program aimed to tighten drill spacing to support future resource classification for the A Vein.
Evidence · text
“The A Vein drilling tightened drill spacing to 15m-20m spaced holes to support future resource classification.”
26FCRC001Sybil · goldGrade: 3.76Grade Unit: g/tIntercept: 6 mView all detailsHide details
Identity
- Hole ID
- 26FCRC001
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 3.76
- Grade Unit
- g/t
- Intercept
- 6 m
- From
- 20 m
- To
- 26 m
- Intercept Depth
- 20 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC001:20-26
Location
- Location
- Francis Creek
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil is below the project's average grade but still represents a moderate result for an epithermal deposit, though true width is not provided.
Positive factors
- Moderate grade-thickness product (22.56 g/t*m) for an epithermal deposit
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (3.76 g/t Au) is below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“6m @ 3.76g/t Au from 20m (26FCRC001)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“6m @ 3.76g/t Au from 20m”
26FCRC001Sybil · goldGrade: 9.47Grade Unit: g/tIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- 26FCRC001
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 9.47
- Grade Unit
- g/t
- Intercept
- 1 m
- From
- 24 m
- To
- 25 m
- Intercept Depth
- 20 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC001:24-25
Location
- Location
- Francis Creek
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This sub-interval at Sybil shows a grade consistent with the project average, but over a narrow width, and true width is not provided.
Positive factors
- Grade (9.47 g/t Au) is in line with project average (9.452 g/t Au)
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Narrow intercept length (1m)
- Apparent width only, true width not stated
Evidence · text
“1m @ 9.47g/t Au from 24m”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“1m @ 9.47g/t Au from 24m”
26FCRC018Sybil · goldGrade: 3.52Grade Unit: g/tIntercept: 5 mView all detailsHide details
Identity
- Hole ID
- 26FCRC018
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 3.52
- Grade Unit
- g/t
- Intercept
- 5 m
- From
- 25 m
- To
- 30 m
- Intercept Depth
- 25 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC018:25-30
Location
- Location
- Francis Creek
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil is below the project's average grade but still represents a moderate result for an epithermal deposit, though true width is not provided.
Positive factors
- Moderate grade-thickness product (17.6 g/t*m) for an epithermal deposit
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (3.52 g/t Au) is below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“5m @ 3.52g/t Au from 25m (26FCRC018)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“5m @ 3.52g/t Au from 25m”
26FCRC017Sybil · goldGrade: 2.84Grade Unit: g/tIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- 26FCRC017
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 2.84
- Grade Unit
- g/t
- Intercept
- 4 m
- From
- 52 m
- To
- 56 m
- Intercept Depth
- 52 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC017:52-56
Location
- Location
- Francis Creek
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil is significantly below the project's average grade, representing a weaker result, and true width is not provided.
Positive factors
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (2.84 g/t Au) is significantly below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“4m @ 2.84g/t Au from 52m (26FCRC017)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“4m @ 2.84g/t Au from 52m”
26FCRC015Sybil · goldGrade: 2.32Grade Unit: g/tIntercept: 5 mView all detailsHide details
Identity
- Hole ID
- 26FCRC015
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 2.32
- Grade Unit
- g/t
- Intercept
- 5 m
- From
- 114 m
- To
- 119 m
- Intercept Depth
- 114 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC015:114-119
Location
- Location
- Francis Creek
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil is significantly below the project's average grade, representing a weaker result, and true width is not provided.
Positive factors
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (2.32 g/t Au) is significantly below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“5m @ 2.32g/t Au from 114m (26FCRC015)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“5m @ 2.32g/t Au from 114m”
26FCRC002Sybil · goldGrade: 1.57Grade Unit: g/tIntercept: 5 mView all detailsHide details
Identity
- Hole ID
- 26FCRC002
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 1.57
- Grade Unit
- g/t
- Intercept
- 5 m
- From
- 42 m
- To
- 47 m
- Intercept Depth
- 42 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC002:42-47
Location
- Location
- Francis Creek
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil is significantly below the project's average grade, representing a weaker result, and true width is not provided.
Positive factors
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (1.57 g/t Au) is significantly below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“5m @ 1.57g/t Au from 42m (26FCRC002)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“5m @ 1.57g/t Au from 42m”
26FCRC032Sybil · goldGrade: 2.52Grade Unit: g/tIntercept: 3 mView all detailsHide details
Identity
- Hole ID
- 26FCRC032
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 2.52
- Grade Unit
- g/t
- Intercept
- 3 m
- From
- 97 m
- To
- 100 m
- Intercept Depth
- 97 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC032:97-100
Location
- Location
- Francis Creek
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil is significantly below the project's average grade, representing a weaker result, and true width is not provided.
Positive factors
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (2.52 g/t Au) is significantly below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“3m @ 2.52g/t Au from 97m (26FCRC032).”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“3m @ 2.52g/t Au from 97m”
26FCRC024Sybil · goldGrade: 2.12Grade Unit: g/tIntercept: 2 mView all detailsHide details
Identity
- Hole ID
- 26FCRC024
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 2.12
- Grade Unit
- g/t
- Intercept
- 2 m
- From
- 11 m
- To
- 13 m
- Intercept Depth
- 11 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC024:11-13
Location
- Location
- Francis Creek, D Vein
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil confirms extensions to shallow mineralisation but is significantly below the project's average grade, and true width is not provided.
Positive factors
- Confirms extensions to shallow gold mineralisation
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (2.12 g/t Au) is significantly below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“2m @ 2.12g/t Au from 11m (26FCRC024 – D Vein)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The drilling confirmed extensions (~150m north of the Main Vein) to shallow gold mineralisation.
Evidence · text
“Sunshine drilling has confirmed extensions (~150m north of the Main Vein) to shallow gold mineralisation”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“2m @ 2.12g/t Au from 11m”
26FCRC026Sybil · goldGrade: 1.27Grade Unit: g/tIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- 26FCRC026
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 1.27
- Grade Unit
- g/t
- Intercept
- 1 m
- From
- 36 m
- To
- 37 m
- Intercept Depth
- 36 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC026:36-37
Location
- Location
- Francis Creek, C Vein
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil confirms extensions to shallow mineralisation but is significantly below the project's average grade and over a narrow width, with no true width provided.
Positive factors
- Confirms extensions to shallow gold mineralisation
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (1.27 g/t Au) is significantly below project average (9.452 g/t Au)
- Narrow intercept length (1m)
- Apparent width only, true width not stated
Evidence · text
“1m @ 1.27g/t Au from 36m (26FCRC026 – C Vein).”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The drilling confirmed extensions (~150m north of the Main Vein) to shallow gold mineralisation.
Evidence · text
“Sunshine drilling has confirmed extensions (~150m north of the Main Vein) to shallow gold mineralisation”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“1m @ 1.27g/t Au from 36m”
26FCRC021Sybil · goldGrade: 1.82Grade Unit: g/tIntercept: 8 mView all detailsHide details
Identity
- Hole ID
- 26FCRC021
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 1.82
- Grade Unit
- g/t
- Intercept
- 8 m
- From
- 25 m
- To
- 33 m
- Intercept Depth
- 25 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC021:25-33
Location
- Location
- Francis Creek, Main Vein
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept at Sybil confirms economic intercepts from shallow drilling but is significantly below the project's average grade, and true width is not provided.
Positive factors
- Confirms economic intercepts from very shallow drilling
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Grade (1.82 g/t Au) is significantly below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“8m @ 1.82g/t Au from 25m (26FCRC021)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“8m @ 1.82g/t Au from 25m”
26FCRC021Sybil · goldGrade: 5.57Grade Unit: g/tIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- 26FCRC021
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 5.57
- Grade Unit
- g/t
- Intercept
- 1 m
- From
- 28 m
- To
- 29 m
- Intercept Depth
- 25 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26FCRC021:28-29
Location
- Location
- Francis Creek, Main Vein
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This sub-interval at Sybil shows a high-grade intercept, but over a narrow width, and true width is not provided.
Positive factors
- Grade (5.57 g/t Au) is above the exceptional threshold for epithermal deposits
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- Narrow intercept length (1m)
- Apparent width only, true width not stated
Evidence · text
“1m @ 5.57g/t Au from 28m”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: The grade of 5.57 g/t Au is above the exceptional threshold of 5 g/t Au for epithermal gold deposits.
Evidence · text
“1m @ 5.57g/t Au from 28m”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“1m @ 5.57g/t Au from 28m”
FCP013Sybil · goldGrade: 4.4Grade Unit: g/tIntercept: 2 mHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Hole ID
- FCP013
- Project
- Sybil
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- australia_qld
- Ticker
- SHN
Geometry
- Grade
- 4.4
- Grade Unit
- g/t
- Intercept
- 2 m
- From
- 15 m
- To
- 17 m
- Intercept Depth
- 15 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- FCP013:15-17
Location
- Location
- Francis Creek, Main Vein
- Loc. Source
- document
QA/QC
- Laboratory
- Intertek and ALS
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Interp. Status
- scored
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This historical intercept at Sybil is below the project's average grade and true width is not provided, offering low novelty.
Positive factors
- QA/QC procedures are disclosed, enhancing confidence
Negative factors
- This is a historical intercept, not a new result
- Grade (4.4 g/t Au) is below project average (9.452 g/t Au)
- Apparent width only, true width not stated
Evidence · text
“2m @ 4.40g/t Au from 15m (FCP013) – historic.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Stale Data Re-releaseRejected · negative
Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
Reason: This is explicitly stated as a 'historic' intercept, indicating it's a re-release of old data.
Evidence · text
“2m @ 4.40g/t Au from 15m (FCP013) – historic.”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release mentions the use of standards, blanks, and duplicates, and assaying by certified labs Intertek and ALS.
Evidence · text
“Sunshine Metals employs field quality control (QC) procedures, including addition of standards, blanks and duplicates ahead of assaying which was undertaken using industry standard fire assay at Intertek and ALS laboratories in Townsville.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The interval is given as downhole width with no true width or drill orientation.
Evidence · text
“2m @ 4.40g/t Au from 15m”
Resource Estimates (46)
Fact 1Liontown · goldTonnes: 7300000Contained Metal: 745000Contained Unit: koz aueqView all detailsHide details
Identity
- Project
- Liontown
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:a349ac8c741c738492e5
Resource Data
- Tonnes
- 7300000
- Contained Metal
- 745000
- Contained Unit
- koz aueq
Prior Estimate
- Resource Date
- 2026-07-15
Metal Equivalent
- Metal Eq. Grade
- 3.2
- Metal Eq. Unit
- g/t AuEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Liontown resource shows a significant contained metal figure, but the average grade has decreased compared to the prior estimate, suggesting dilutive growth.
Positive factors
- Significant contained metal (745Koz AuEq) for the project
- Resource is JORC compliant and QP signed
- Metal equivalent assumptions are disclosed, providing transparency
Negative factors
- Grade of 3.2 g/t AuEq is lower than prior estimate of 3.6 g/t AuEq, indicating dilutive growth
Evidence · text
“Updated Liontown Resource now totals 7.3Mt @ 3.2g/t AuEq for 745Koz AuEq recoverable”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 2Liontown · zincTonnes: 7300000View all detailsHide details
Identity
- Project
- Liontown
- Commodity
- zinc
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:a349ac8c741c738492e5
Resource Data
- Tonnes
- 7300000
Prior Estimate
- Resource Date
- 2026-07-15
Metal Equivalent
- Metal Eq. Grade
- 10.9
- Metal Eq. Unit
- % ZnEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Liontown resource includes a significant zinc equivalent grade, with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
- Metal equivalent assumptions are disclosed, providing transparency
Evidence · text
“Updated Liontown Resource now totals 7.3Mt @ 3.2g/t AuEq for 745Koz AuEq recoverable (or 10.9% ZnEq)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 3Liontown · goldTonnes: 7300000Grade: 1.43Grade Unit: g/tView all detailsHide details
Identity
- Project
- Liontown
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:a349ac8c741c738492e5
Resource Data
- Tonnes
- 7300000
- Grade
- 1.43
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Liontown resource includes a gold component, with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.43g/t Au, 25.0g/t Ag, 0.7% Cu, 3.9% Zn & 1.4% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 4Liontown · silverTonnes: 7300000Grade: 25Grade Unit: g/tView all detailsHide details
Identity
- Project
- Liontown
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:a349ac8c741c738492e5
Resource Data
- Tonnes
- 7300000
- Grade
- 25
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Liontown resource includes a silver component, with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.43g/t Au, 25.0g/t Ag, 0.7% Cu, 3.9% Zn & 1.4% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 5Liontown · copperTonnes: 7300000Grade: 0.7Grade Unit: %View all detailsHide details
Identity
- Project
- Liontown
- Commodity
- copper
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:a349ac8c741c738492e5
Resource Data
- Tonnes
- 7300000
- Grade
- 0.7
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Liontown resource includes a copper component, with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.43g/t Au, 25.0g/t Ag, 0.7% Cu, 3.9% Zn & 1.4% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 6Liontown · zincTonnes: 7300000Grade: 3.9Grade Unit: %View all detailsHide details
Identity
- Project
- Liontown
- Commodity
- zinc
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:a349ac8c741c738492e5
Resource Data
- Tonnes
- 7300000
- Grade
- 3.9
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Liontown resource includes a zinc component, with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.43g/t Au, 25.0g/t Ag, 0.7% Cu, 3.9% Zn & 1.4% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 7Liontown · leadTonnes: 7300000Grade: 1.4Grade Unit: %View all detailsHide details
Identity
- Project
- Liontown
- Commodity
- lead
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:a349ac8c741c738492e5
Resource Data
- Tonnes
- 7300000
- Grade
- 1.4
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Liontown resource includes a lead component, with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.43g/t Au, 25.0g/t Ag, 0.7% Cu, 3.9% Zn & 1.4% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 8Ravenswood Consolidated Project · goldTonnes: 8400000Contained Metal: 931000Contained Unit: koz aueqView all detailsHide details
Identity
- Project
- Ravenswood Consolidated Project
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez, Stuart Hutchin
- Resource group id
- resource:3ecee1d6ff04900733bf
Resource Data
- Tonnes
- 8400000
- Contained Metal
- 931000
- Contained Unit
- koz aueq
Prior Estimate
- Resource Date
- 2026-07-15
Metal Equivalent
- Metal Eq. Grade
- 3.5
- Metal Eq. Unit
- g/t AuEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Ravenswood Consolidated Project resource shows a significant contained metal figure with transparent assumptions.
Positive factors
- Significant contained metal (931Koz AuEq) for the project
- Resource is JORC compliant and QP signed
- Metal equivalent assumptions are disclosed, providing transparency
Evidence · text
“The Ravenswood Consolidated Project Resource (Liontown + Waterloo + Orient) now totals: 8.4Mt @ 3.5g/t AuEq for 931Koz AuEq recoverable”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 9Ravenswood Consolidated Project · zincTonnes: 8400000View all detailsHide details
Identity
- Project
- Ravenswood Consolidated Project
- Commodity
- zinc
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez, Stuart Hutchin
- Resource group id
- resource:3ecee1d6ff04900733bf
Resource Data
- Tonnes
- 8400000
Prior Estimate
- Resource Date
- 2026-07-15
Metal Equivalent
- Metal Eq. Grade
- 11.8
- Metal Eq. Unit
- % ZnEq
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Ravenswood Consolidated Project resource includes a significant zinc equivalent grade with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
- Metal equivalent assumptions are disclosed, providing transparency
Evidence · text
“The Ravenswood Consolidated Project Resource (Liontown + Waterloo + Orient) now totals: 8.4Mt @ 3.5g/t AuEq for 931Koz AuEq recoverable (or 11.8% ZnEq)”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 10Ravenswood Consolidated Project · goldTonnes: 8400000Grade: 1.3Grade Unit: g/tView all detailsHide details
Identity
- Project
- Ravenswood Consolidated Project
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez, Stuart Hutchin
- Resource group id
- resource:3ecee1d6ff04900733bf
Resource Data
- Tonnes
- 8400000
- Grade
- 1.3
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Ravenswood Consolidated Project resource includes a gold component with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.3g/t Au, 28g/t Ag, 0.8% Cu, 4.7% Zn & 1.5% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 11Ravenswood Consolidated Project · silverTonnes: 8400000Grade: 28Grade Unit: g/tView all detailsHide details
Identity
- Project
- Ravenswood Consolidated Project
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez, Stuart Hutchin
- Resource group id
- resource:3ecee1d6ff04900733bf
Resource Data
- Tonnes
- 8400000
- Grade
- 28
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Ravenswood Consolidated Project resource includes a silver component with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.3g/t Au, 28g/t Ag, 0.8% Cu, 4.7% Zn & 1.5% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 12Ravenswood Consolidated Project · copperTonnes: 8400000Grade: 0.8Grade Unit: %View all detailsHide details
Identity
- Project
- Ravenswood Consolidated Project
- Commodity
- copper
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez, Stuart Hutchin
- Resource group id
- resource:3ecee1d6ff04900733bf
Resource Data
- Tonnes
- 8400000
- Grade
- 0.8
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Ravenswood Consolidated Project resource includes a copper component with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.3g/t Au, 28g/t Ag, 0.8% Cu, 4.7% Zn & 1.5% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 13Ravenswood Consolidated Project · zincTonnes: 8400000Grade: 4.7Grade Unit: %View all detailsHide details
Identity
- Project
- Ravenswood Consolidated Project
- Commodity
- zinc
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez, Stuart Hutchin
- Resource group id
- resource:3ecee1d6ff04900733bf
Resource Data
- Tonnes
- 8400000
- Grade
- 4.7
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Ravenswood Consolidated Project resource includes a zinc component with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.3g/t Au, 28g/t Ag, 0.8% Cu, 4.7% Zn & 1.5% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 14Ravenswood Consolidated Project · leadTonnes: 8400000Grade: 1.5Grade Unit: %View all detailsHide details
Identity
- Project
- Ravenswood Consolidated Project
- Commodity
- lead
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez, Stuart Hutchin
- Resource group id
- resource:3ecee1d6ff04900733bf
Resource Data
- Tonnes
- 8400000
- Grade
- 1.5
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Ravenswood Consolidated Project resource includes a lead component with transparent assumptions.
Positive factors
- Resource is JORC compliant and QP signed
Evidence · text
“AuEq comprised of 1.3g/t Au, 28g/t Ag, 0.8% Cu, 4.7% Zn & 1.5% Pb.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 15Liontown Gold Study · goldTonnes: 1000000Grade: 3.8Grade Unit: g/tContained Metal: 122.6Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:28fbcd635e7baddb120e
Resource Data
- Tonnes
- 1000000
- Grade
- 3.8
- Grade Unit
- g/t
- Contained Metal
- 122.6
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The Liontown Gold Study Resource shows strong growth in contained gold, silver, and tonnage, indicating positive progress for the gold-dominant portion of the project.
Positive factors
- Significant contained gold (122.6Koz Au) for the gold-dominant portion of the resource
- Resource is JORC compliant and QP signed
- Increased by 13% contained gold, 21% contained silver, and 28% in overall tonnes
Evidence · text
“The Liontown Gold Study Resource now totals: 1.0Mt @ 3.8g/t Au & 29.9g/t Ag for 122.6Koz Au & 975Koz Ag.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 16Liontown Gold Study · silverTonnes: 1000000Grade: 29.9Grade Unit: g/tContained Metal: 975Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:28fbcd635e7baddb120e
Resource Data
- Tonnes
- 1000000
- Grade
- 29.9
- Grade Unit
- g/t
- Contained Metal
- 975
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The Liontown Gold Study Resource shows strong growth in contained gold, silver, and tonnage, indicating positive progress for the gold-dominant portion of the project.
Positive factors
- Significant contained silver (975Koz Ag) for the gold-dominant portion of the resource
- Resource is JORC compliant and QP signed
- Increased by 13% contained gold, 21% contained silver, and 28% in overall tonnes
Evidence · text
“The Liontown Gold Study Resource now totals: 1.0Mt @ 3.8g/t Au & 29.9g/t Ag for 122.6Koz Au & 975Koz Ag.”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
measuredLiontown Gold Study · goldTonnes: 39000Grade: 2.89Grade Unit: g/tContained Metal: 3.7Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:d1f25fa6de9ecc31f092
- Deposit or zone
- Shallow Au
Resource Data
- Category
- measured
- Tonnes
- 39000
- Grade
- 2.89
- Grade Unit
- g/t
- Contained Metal
- 3.7
- Contained Unit
- koz
- Cutoff Grade
- 0.75
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Measured resource for Shallow Au at Liontown Gold Study provides high confidence in the estimate with disclosed cut-off grade.
Positive factors
- Measured category indicates high confidence in the estimate
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“2.89”
Context: 39
measuredLiontown Gold Study · silverTonnes: 39000Grade: 78.3Grade Unit: g/tContained Metal: 99.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:d1f25fa6de9ecc31f092
- Deposit or zone
- Shallow Au
Resource Data
- Category
- measured
- Tonnes
- 39000
- Grade
- 78.3
- Grade Unit
- g/t
- Contained Metal
- 99.3
- Contained Unit
- koz
- Cutoff Grade
- 0.75
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Measured resource for Shallow Au at Liontown Gold Study provides high confidence in the estimate with disclosed cut-off grade.
Positive factors
- Measured category indicates high confidence in the estimate
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“78.3”
Context: 39
indicatedLiontown Gold Study · goldTonnes: 317000Grade: 2.16Grade Unit: g/tContained Metal: 22Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:88f841494d44c28a2c33
- Deposit or zone
- Shallow Au
Resource Data
- Category
- indicated
- Tonnes
- 317000
- Grade
- 2.16
- Grade Unit
- g/t
- Contained Metal
- 22
- Contained Unit
- koz
- Cutoff Grade
- 0.75
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Indicated resource for Shallow Au at Liontown Gold Study provides reasonable confidence with disclosed cut-off grade.
Positive factors
- Indicated category provides reasonable geological confidence
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“2.16”
Context: 317
indicatedLiontown Gold Study · silverTonnes: 317000Grade: 27.6Grade Unit: g/tContained Metal: 281.7Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:88f841494d44c28a2c33
- Deposit or zone
- Shallow Au
Resource Data
- Category
- indicated
- Tonnes
- 317000
- Grade
- 27.6
- Grade Unit
- g/t
- Contained Metal
- 281.7
- Contained Unit
- koz
- Cutoff Grade
- 0.75
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Indicated resource for Shallow Au at Liontown Gold Study provides reasonable confidence with disclosed cut-off grade.
Positive factors
- Indicated category provides reasonable geological confidence
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“27.6”
Context: 317
inferredLiontown Gold Study · goldTonnes: 74000Grade: 2Grade Unit: g/tContained Metal: 4.8Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:172ce4a21fb2ebb668a1
- Deposit or zone
- Shallow Au
Resource Data
- Category
- inferred
- Tonnes
- 74000
- Grade
- 2
- Grade Unit
- g/t
- Contained Metal
- 4.8
- Contained Unit
- koz
- Cutoff Grade
- 0.75
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Inferred resource for Shallow Au at Liontown Gold Study provides lower confidence but is JORC compliant with disclosed cut-off grade.
Positive factors
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Negative factors
- Inferred category indicates lower geological confidence
Evidence · table
“2.00”
Context: 74
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, indicating speculative geological confidence.
Evidence · table
“Inferred”
Context: 74
inferredLiontown Gold Study · silverTonnes: 74000Grade: 14.7Grade Unit: g/tContained Metal: 35.1Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:172ce4a21fb2ebb668a1
- Deposit or zone
- Shallow Au
Resource Data
- Category
- inferred
- Tonnes
- 74000
- Grade
- 14.7
- Grade Unit
- g/t
- Contained Metal
- 35.1
- Contained Unit
- koz
- Cutoff Grade
- 0.75
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Inferred resource for Shallow Au at Liontown Gold Study provides lower confidence but is JORC compliant with disclosed cut-off grade.
Positive factors
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Negative factors
- Inferred category indicates lower geological confidence
Evidence · table
“14.7”
Context: 74
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, indicating speculative geological confidence.
Evidence · table
“Inferred”
Context: 74
measuredLiontown Gold Study · goldTonnes: 21000Grade: 2.58Grade Unit: g/tContained Metal: 1.7Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:c5516475ce46525effdc
- Deposit or zone
- Carrington Fresh
Resource Data
- Category
- measured
- Tonnes
- 21000
- Grade
- 2.58
- Grade Unit
- g/t
- Contained Metal
- 1.7
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Measured resource for Carrington Fresh at Liontown Gold Study provides high confidence in the estimate with disclosed cut-off grade.
Positive factors
- Measured category indicates high confidence in the estimate
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“2.58”
Context: 21
measuredLiontown Gold Study · silverTonnes: 21000Grade: 91.6Grade Unit: g/tContained Metal: 61.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:c5516475ce46525effdc
- Deposit or zone
- Carrington Fresh
Resource Data
- Category
- measured
- Tonnes
- 21000
- Grade
- 91.6
- Grade Unit
- g/t
- Contained Metal
- 61.4
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Measured resource for Carrington Fresh at Liontown Gold Study provides high confidence in the estimate with disclosed cut-off grade.
Positive factors
- Measured category indicates high confidence in the estimate
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“91.6”
Context: 21
indicatedLiontown Gold Study · goldTonnes: 252000Grade: 2.99Grade Unit: g/tContained Metal: 24.2Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:03806ae596276910a8c1
- Deposit or zone
- Carrington Fresh
Resource Data
- Category
- indicated
- Tonnes
- 252000
- Grade
- 2.99
- Grade Unit
- g/t
- Contained Metal
- 24.2
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Indicated resource for Carrington Fresh at Liontown Gold Study provides reasonable confidence with disclosed cut-off grade.
Positive factors
- Indicated category provides reasonable geological confidence
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“2.99”
Context: 252
indicatedLiontown Gold Study · silverTonnes: 252000Grade: 47.7Grade Unit: g/tContained Metal: 387Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:03806ae596276910a8c1
- Deposit or zone
- Carrington Fresh
Resource Data
- Category
- indicated
- Tonnes
- 252000
- Grade
- 47.7
- Grade Unit
- g/t
- Contained Metal
- 387
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Indicated resource for Carrington Fresh at Liontown Gold Study provides reasonable confidence with disclosed cut-off grade.
Positive factors
- Indicated category provides reasonable geological confidence
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“47.7”
Context: 252
inferredLiontown Gold Study · goldTonnes: 24000Grade: 3.23Grade Unit: g/tContained Metal: 2.5Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:3b9b4f14cfab7a1b2ea0
- Deposit or zone
- Carrington Fresh
Resource Data
- Category
- inferred
- Tonnes
- 24000
- Grade
- 3.23
- Grade Unit
- g/t
- Contained Metal
- 2.5
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Inferred resource for Carrington Fresh at Liontown Gold Study provides lower confidence but is JORC compliant with disclosed cut-off grade.
Positive factors
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Negative factors
- Inferred category indicates lower geological confidence
Evidence · table
“3.23”
Context: 24
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, indicating speculative geological confidence.
Evidence · table
“Inferred”
Context: 24
inferredLiontown Gold Study · silverTonnes: 24000Grade: 18.8Grade Unit: g/tContained Metal: 14.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:3b9b4f14cfab7a1b2ea0
- Deposit or zone
- Carrington Fresh
Resource Data
- Category
- inferred
- Tonnes
- 24000
- Grade
- 18.8
- Grade Unit
- g/t
- Contained Metal
- 14.3
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Inferred resource for Carrington Fresh at Liontown Gold Study provides lower confidence but is JORC compliant with disclosed cut-off grade.
Positive factors
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Negative factors
- Inferred category indicates lower geological confidence
Evidence · table
“18.8”
Context: 24
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, indicating speculative geological confidence.
Evidence · table
“Inferred”
Context: 24
indicatedLiontown Gold Study · goldTonnes: 177000Grade: 7.26Grade Unit: g/tContained Metal: 41.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:497143077c0f0fbbd170
- Deposit or zone
- Au Panel Fresh
Resource Data
- Category
- indicated
- Tonnes
- 177000
- Grade
- 7.26
- Grade Unit
- g/t
- Contained Metal
- 41.4
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Indicated resource for Au Panel Fresh at Liontown Gold Study shows a high grade with reasonable confidence and disclosed cut-off grade.
Positive factors
- High grade (7.26 g/t Au) for an Indicated resource
- Indicated category provides reasonable geological confidence
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“7.26”
Context: 177
indicatedLiontown Gold Study · silverTonnes: 177000Grade: 8Grade Unit: g/tContained Metal: 45.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:497143077c0f0fbbd170
- Deposit or zone
- Au Panel Fresh
Resource Data
- Category
- indicated
- Tonnes
- 177000
- Grade
- 8
- Grade Unit
- g/t
- Contained Metal
- 45.4
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Indicated resource for Au Panel Fresh at Liontown Gold Study shows a high grade with reasonable confidence and disclosed cut-off grade.
Positive factors
- Indicated category provides reasonable geological confidence
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Evidence · table
“8.0”
Context: 177
inferredLiontown Gold Study · goldTonnes: 111000Grade: 6.27Grade Unit: g/tContained Metal: 22.4Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:8fdccb7edb10dddeb9e9
- Deposit or zone
- Au Panel Fresh
Resource Data
- Category
- inferred
- Tonnes
- 111000
- Grade
- 6.27
- Grade Unit
- g/t
- Contained Metal
- 22.4
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Inferred resource for Au Panel Fresh at Liontown Gold Study shows a high grade but with lower confidence, and disclosed cut-off grade.
Positive factors
- High grade (6.27 g/t Au) for an Inferred resource
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Negative factors
- Inferred category indicates lower geological confidence
Evidence · table
“6.27”
Context: 111
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, indicating speculative geological confidence.
Evidence · table
“Inferred”
Context: 111
inferredLiontown Gold Study · silverTonnes: 111000Grade: 14.3Grade Unit: g/tContained Metal: 51.3Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown Gold Study
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Esteban Jimenez
- Resource group id
- resource:8fdccb7edb10dddeb9e9
- Deposit or zone
- Au Panel Fresh
Resource Data
- Category
- inferred
- Tonnes
- 111000
- Grade
- 14.3
- Grade Unit
- g/t
- Contained Metal
- 51.3
- Contained Unit
- koz
- Cutoff Grade
- 2
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This Inferred resource for Au Panel Fresh at Liontown Gold Study provides lower confidence but is JORC compliant with disclosed cut-off grade.
Positive factors
- Resource is JORC compliant and QP signed
- Cut-off grade is disclosed, providing transparency
Negative factors
- Inferred category indicates lower geological confidence
Evidence · table
“14.3”
Context: 111
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, indicating speculative geological confidence.
Evidence · table
“Inferred”
Context: 111
Fact 33Waterloo · goldTonnes: 700000Grade: 1Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Waterloo
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:3f3160ef79cafb543304
Resource Data
- Tonnes
- 700000
- Grade
- 1
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Waterloo, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.7Mt Waterloo Resource, containing 1.0g/t Au”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 34Waterloo · copperTonnes: 700000Grade: 1.8Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Waterloo
- Commodity
- copper
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:3f3160ef79cafb543304
Resource Data
- Tonnes
- 700000
- Grade
- 1.8
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Waterloo, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.7Mt Waterloo Resource, containing 1.0g/t Au, 1.8% Cu”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 35Waterloo · zincTonnes: 700000Grade: 10.5Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Waterloo
- Commodity
- zinc
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:3f3160ef79cafb543304
Resource Data
- Tonnes
- 700000
- Grade
- 10.5
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Waterloo, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.7Mt Waterloo Resource, containing 1.0g/t Au, 1.8% Cu, 10.5% Zn”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 36Waterloo · silverTonnes: 700000Grade: 53Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Waterloo
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:3f3160ef79cafb543304
Resource Data
- Tonnes
- 700000
- Grade
- 53
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Waterloo, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.7Mt Waterloo Resource, containing 1.0g/t Au, 1.8% Cu, 10.5% Zn, 53g/t Ag”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 37Waterloo · leadTonnes: 700000Grade: 1.5Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Waterloo
- Commodity
- lead
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:3f3160ef79cafb543304
Resource Data
- Tonnes
- 700000
- Grade
- 1.5
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Waterloo, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.7Mt Waterloo Resource, containing 1.0g/t Au, 1.8% Cu, 10.5% Zn, 53g/t Ag, 1.5% Pb”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 38Orient · goldTonnes: 400000Grade: 0.2Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Orient
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:f3455ad1fd592c81f54b
Resource Data
- Tonnes
- 400000
- Grade
- 0.2
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Orient, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.4Mt Orient Resource containing 0.2g/t Au”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 39Orient · copperTonnes: 400000Grade: 1.1Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Orient
- Commodity
- copper
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:f3455ad1fd592c81f54b
Resource Data
- Tonnes
- 400000
- Grade
- 1.1
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Orient, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.4Mt Orient Resource containing 0.2g/t Au, 1.1% Cu”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 40Orient · zincTonnes: 400000Grade: 11.2Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Orient
- Commodity
- zinc
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:f3455ad1fd592c81f54b
Resource Data
- Tonnes
- 400000
- Grade
- 11.2
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Orient, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.4Mt Orient Resource containing 0.2g/t Au, 1.1% Cu, 11.2% Zn”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 41Orient · silverTonnes: 400000Grade: 55Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Orient
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:f3455ad1fd592c81f54b
Resource Data
- Tonnes
- 400000
- Grade
- 55
- Grade Unit
- g/t
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Orient, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.4Mt Orient Resource containing 0.2g/t Au, 1.1% Cu, 11.2% Zn, 55g/t Ag”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 42Orient · leadTonnes: 400000Grade: 2.5Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Orient
- Commodity
- lead
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin
- Resource group id
- resource:f3455ad1fd592c81f54b
Resource Data
- Tonnes
- 400000
- Grade
- 2.5
- Grade Unit
- %
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Orient, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“0.4Mt Orient Resource containing 0.2g/t Au, 1.1% Cu, 11.2% Zn, 55g/t Ag, 2.5% Pb”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Fact 43Plateau · goldContained Metal: 50Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Plateau
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Damien Keys
- Resource group id
- resource:a3fd11b5b0c845e76972
Resource Data
- Contained Metal
- 50
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-07-15
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical resource estimate for Plateau, mentioned as background and not part of the current Mining Study, thus having low novelty.
Positive factors
- Resource is JORC compliant and QP signed
Negative factors
- This is a historical estimate, not a new update
- Not incorporated into the current Mining Study
Evidence · text
“50Koz Au Plateau Resource;”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 44Liontown · goldGrade: 2.6Grade Unit: g/tContained Metal: 80Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown
- Commodity
- gold
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Reporting standards
- jorc
- Resource group id
- resource:dd40f3573f5fb8612110
Resource Data
- Grade
- 2.6
- Grade Unit
- g/t
- Contained Metal
- 80
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-21
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Mining Study for Liontown outlines a strong gold production target with high confidence, supporting a robust economic case for the project.
Positive factors
- Significant production target (80Koz Au) with high Measured & Indicated confidence (84%)
- Study prepared in compliance with JORC, enhancing credibility
- Outlines a robust economic case for the project
Evidence · text
“production target of ~80Koz Au @ 2.6g/t Au”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 45Liontown · silverGrade: 31Grade Unit: g/tContained Metal: 952Contained Unit: kozView all detailsHide details
Identity
- Project
- Liontown
- Commodity
- silver
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Reporting standards
- jorc
- Resource group id
- resource:dd40f3573f5fb8612110
Resource Data
- Grade
- 31
- Grade Unit
- g/t
- Contained Metal
- 952
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-21
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Mining Study for Liontown outlines a strong silver production target with high confidence, supporting a robust economic case for the project.
Positive factors
- Significant production target (952Koz Ag) with high Measured & Indicated confidence (84%)
- Study prepared in compliance with JORC, enhancing credibility
- Outlines a robust economic case for the project
Evidence · text
“952Koz Ag @ 31.0g/t Ag”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 46LiontownGrade Unit: MView all detailsHide details
Identity
- Project
- Liontown
- Region
- australia_qld
- Reported Region
- Queensland
- Ticker
- SHN
Resource scope
- Reporting standards
- jorc
- Resource group id
- resource:dd40f3573f5fb8612110
Resource Data
- Grade Unit
- M
Prior Estimate
- Resource Date
- 2026-09-21
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The updated Mining Study for Liontown demonstrates strong estimated Net Operating Cashflow, indicating robust project economics with transparent assumptions.
Positive factors
- Strong estimated Net Operating Cashflow ($179.8M) indicates robust project economics
- Study prepared in compliance with JORC, enhancing credibility
- Commodity price assumptions are disclosed, providing transparency
Evidence · text
“generating estimated Net Operating Cashflow (after all capital) of ~$179.8M (@ $6,500oz Au & $100oz Ag).”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.