RKB: Quarterly Activities/Appendix 5B Cash Flow Report

Original announcement by asx on

Company
Rokeby Resources Limited
Ticker
RKB
Exchange
ASX
Region
Victoria, Australia
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Drill results, Resource update, Other, Metallurgy
Extracted
2026-10-30 08:28:07 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Rokeby Resources Limited reported high-grade gold assay results from its maiden drilling program at the Sunnyside deposit, including 0.45m at 29.2g/t gold, and completed a maiden JORC (2012) Inferred Mineral Resource Estimate for the Powers Gully surface stockpile of 66,565 tonnes at 5.29g/t gold for 11,337 ounces. Despite these positive operational updates, the company faces significant financial challenges, with only $156K cash available at quarter-end and an estimated 0.19 quarters of funding, necessitating immediate cost reductions and further capital raising efforts.

Reasoning: Rokeby Resources reported encouraging high-grade gold drill results and a maiden Inferred resource for a gold stockpile, demonstrating project advancement. However, the company faces severe financial constraints with minimal cash reserves and a short funding outlook, necessitating urgent capital raising and cost-cutting measures that temper the positive technical news.

Positive factors

  • High-grade gold intercepts (29.2 g/t Au over 0.45m).
  • Maiden Inferred Mineral Resource Estimate for Powers Gully stockpile (11,337 oz at 5.29 g/t Au).
  • Identification of a new mineralised zone at Sunnyside.
  • Positive preliminary metallurgical test work (98% recovery on one sample).
  • Cost reduction initiatives and new management team.

Negative factors

  • Critical cash position ($156K) and very short funding runway (0.19 quarters).
  • Need for immediate capital raising.
  • Inferred classification for the maiden MRE, reflecting lower confidence.
  • Incomplete drill core recovery for a high-grade interval in 26SSDH003.
  • Historical MRE is non-JORC compliant and requires verification.
  • Variability in historical metallurgical recoveries for Powers Gully, with the 98% result not assumed for the whole deposit.
  • Limited domain coverage for metallurgical test work (single sample).

Facts used in scoring: 10

Atlas analysis — Rokeby Resources Limited: RKB: Quarterly Activities/Appendix 5B Cash Flow Report. 2.22 g/t over 0.95 m; inferred 66565 tonnes; 98% recovery

Classification and evidence

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: The intercept of 0.45m at 29.2 g/t gold is exceptionally high-grade, well above the typical thresholds for orogenic gold deposits.

Evidence · table

“29.2”

Context: 0.45

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: Hole 26SSDH001 intercepted a new mineralised zone, suggesting an extension beyond previously recognised areas.

Evidence · text

“26SSDH001: 0.45m @ 29.2g/t gold from 122.05m and intercepted a new mineralised zone”

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: Assay results were received for the first six holes from On Site Laboratory Services, indicating disclosure of the laboratory used.

Evidence · text

“assays received for the first six holes from On Site Laboratory Services”

Apparent Width Onlynegative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The drill intercepts are reported as downhole widths without any mention or estimation of true width.

Evidence · text

“Downhole width (m)”

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The drilling program aimed to 'Improve confidence in the geological model within the existing resource area'.

Evidence · text

“Improve confidence in the geological model within the existing resource area”

Drill Core Lossnegative · Story-specific tag

No canonical definition is currently available.

Why it applies: In hole 26SSDH003, part of the target zone was not recovered due to a drill rig issue, meaning the reported result is incomplete.

Evidence · text

“In hole 26SSDH003, part of the target zone was not recovered due to a drill rig issue, and the interval expected to contain the highest grades was not captured. The reported result for this hole is therefore incomplete.”

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The company announced a maiden JORC (2012) Inferred Mineral Resource Estimate for the Powers Gully surface stockpiles.

Evidence · text

“Maiden Mineral Resource Estimate completed for the Powers Gully surface stockpile”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The maiden MRE for Powers Gully is classified as Inferred, which is the lowest level of confidence under the JORC Code.

Evidence · text

“JORC (2012) Inferred Mineral Resource of 66,565 tonnes at 5.29g/t gold for 11,337 ounces of gold”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Mr Mathew Perrot, a Member of The Australian Institute of Geoscientists (MAIG, RPGeo), is named as the Competent Person for the historical resource estimates and implicitly for the new MRE.

Evidence · text

“The information in this ASX announcement that relates to Historical Resource Estimates has been reviewed by Mr Mathew Perrot, who is a Member of The Australian Institute of Geoscientists (MAIG, RPGeo).”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The maiden MRE for Powers Gully is reported as a JORC (2012) Inferred Mineral Resource.

Evidence · text

“JORC (2012) Inferred Mineral Resource of 66,565 tonnes at 5.29g/t gold for 11,337 ounces of gold”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The Powers Gully Stockpile Mineral Resource is reported 'above 0 g/t Au within the stockpile envelope'.

Evidence · text

“reported above 0 g/t Au within the stockpile envelope”

Historical Estimate Onlynegative

Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.

Why it applies: The Mt Wills historical estimate is explicitly stated as 'not reported in accordance with the JORC Code' and requires further work.

Evidence · text

“The estimates set out in Table 1 are historical estimates and are not reported in accordance with the JORC Code.”

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: The historical estimate explicitly states that 'A competent person has not done sufficient work to classify the historical estimate as mineral resources or ore reserves in accordance with the JORC Code'.

Evidence · text

“A competent person has not done sufficient work to classify the historical estimate as mineral resources or ore reserves in accordance with the JORC Code”

High Recoverypositive · Story-specific tag

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Preliminary metallurgical test work on one sample from Powers Gully recovered 98% of the gold.

Evidence · text

“recovered 98% of the gold using cyanide leaching with caustic soda pre-treatment”

Bench Scale Onlynegative · Story-specific tag

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The metallurgical test work was conducted on 'one sample' and is described as 'preliminary, screening-level assessment', with 'further bulk test work is planned'.

Evidence · text

“Recent metallurgical test work on one sample from the upper part of the deposit recovered 98% of the gold”

Single Domain Onlynegative · Story-specific tag

Testing limited to one composite or domain — representativeness not established.

Why it applies: The metallurgical test work was performed on 'one sample from the upper part of the deposit', indicating limited domain coverage.

Evidence · text

“Recent metallurgical test work on one sample from the upper part of the deposit recovered 98% of the gold”

Recovery Not Representativenegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The 98% recovery result from one sample is explicitly stated as 'not assumed to apply to the whole deposit' due to variable historical recoveries.

Evidence · text

“The 98% result is therefore not assumed to apply to the whole deposit, and further bulk test work is planned.”

Financial Distressnegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The company has only $156K cash available and an estimated 0.19 quarters of funding, indicating a critical financial position.

Evidence · text

“Cash and cash equivalents at end of period 156”

Cost Reductionpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company commenced significant reduction of Company and administration costs and implemented significant reduction of Director fees.

Evidence · text

“Significant reduction of Company and administration costs commenced after the quarter with the appointment of a new ASX experienced management team”

Capital Raise Needednegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The company expects to take steps to raise further cash to fund its operations due to its low cash balance and short funding runway.

Evidence · text

“Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful? Yes, the Board is reviewing alternatives.”

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

POX/BIOX Routeneutral

Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.

Why it applies: the document describes a pox_biox route ("roasting")

Extracted facts

Stored fact records: 10. Some facts used in scoring do not have a stored record.

Drill Results (1)

26SSDH003Mt Wills · goldGrade: 2.22Grade Unit: g/tIntercept: 0.95 mView all details
Link to this fact

Identity

Hole ID
26SSDH003
Project
Mt Wills
Commodity
gold
Region
australia_vic
Reported Region
australia_vic
Ticker
RKB

Geometry

Grade
2.22
Grade Unit
g/t
Intercept
0.95 m
From
229.05 m
To
230 m
Intercept Depth
226.2 m

Classification

Deposit Type
orogenic
Program
exploration
Sample Type
drill
Group ID
26SSDH003:229.05-230
Mining Method
underground

Location

Location
Sunnyside
Loc. Source
document

QA/QC

Laboratory
On Site Laboratory Services
QA/QC Disclosed
Yes
QP Signed
No
QA/QC Methods
standards, duplicates

Deleterious

Deleterious Flag
No

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This narrow intercept adds to the geological understanding, but its impact is limited by the width and the drill core loss in the target zone.

Positive factors

  • Moderate gold grade (2.22 g/t) over a narrow width, providing additional data.

Negative factors

  • Narrow intercept length (0.95m) and reported as apparent width only.
  • Drill rig issue resulted in incomplete core recovery for the target zone, potentially missing higher grades.

Evidence · table

“2.22”

Context: 0.95

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Resource Estimates (8)

inferredPowers Gully surface stockpiles · goldTonnes: 66565Grade: 5.29Grade Unit: g/tContained Metal: 11337Contained Unit: ozView all details
Link to this fact

Identity

Project
Powers Gully surface stockpiles
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mathew Perrot
Resource group id
resource:c1b8a70a158d7097d3c2
Deposit or zone
Powers Gully surface stockpiles
Material type
stockpile

Resource Data

Category
inferred
Tonnes
66565
Grade
5.29
Grade Unit
g/t
Contained Metal
11337
Contained Unit
oz
Cutoff Grade
0
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-09-04

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This maiden Inferred MRE for the Powers Gully stockpile is a significant step, establishing a resource with a good grade for a stockpile, but its Inferred classification and underlying geological uncertainties warrant caution.

Positive factors

  • Maiden Mineral Resource Estimate establishes a baseline for the Powers Gully stockpile.
  • Good grade (5.29 g/t Au) for a surface stockpile, indicating potential economic viability.
  • JORC (2012) compliant and signed off by a Competent Person.

Negative factors

  • Resource is classified as Inferred, indicating lower geological confidence.
  • Variable drill spacing, uneven grade distribution, and assumed density contribute to lower confidence.

Evidence · table

“5.29”

Context: 66,565

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMt Wills Project · goldTonnes: 414000Grade: 5.2Grade Unit: g/tContained Metal: 69Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Wills Project
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
No
Resource group id
resource:297fa835ab5850be4c7b
Deposit or zone
Maude

Resource Data

Category
indicated
Tonnes
414000
Grade
5.2
Grade Unit
g/t
Contained Metal
69
Contained Unit
koz

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This historical Indicated resource provides context but is not compliant with current reporting standards and requires further work for verification, limiting its current utility.

Negative factors

  • This is a historical estimate not reported in accordance with the JORC Code.
  • Uncertainty that the historical estimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
  • No Competent Person has done sufficient work to classify this historical estimate.

Evidence · table

“5.2”

Context: 414

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

inferredMt Wills Project · goldTonnes: 999000Grade: 3.5Grade Unit: g/tContained Metal: 112Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Wills Project
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
No
Resource group id
resource:9b4b7afe78922cef979a
Deposit or zone
Maude

Resource Data

Category
inferred
Tonnes
999000
Grade
3.5
Grade Unit
g/t
Contained Metal
112
Contained Unit
koz

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This historical Inferred resource provides context but is not compliant with current reporting standards and requires further work for verification, limiting its current utility.

Negative factors

  • This is a historical estimate not reported in accordance with the JORC Code.
  • Uncertainty that the historical estimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
  • No Competent Person has done sufficient work to classify this historical estimate.

Evidence · table

“3.5”

Context: 999

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

indicatedMt Wills Project · goldTonnes: 113000Grade: 8.8Grade Unit: g/tContained Metal: 32Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Wills Project
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
No
Resource group id
resource:db4bb8a13ee1433f0caa
Deposit or zone
Sunnyside

Resource Data

Category
indicated
Tonnes
113000
Grade
8.8
Grade Unit
g/t
Contained Metal
32
Contained Unit
koz

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This historical Indicated resource provides context but is not compliant with current reporting standards and requires further work for verification, limiting its current utility.

Negative factors

  • This is a historical estimate not reported in accordance with the JORC Code.
  • Uncertainty that the historical estimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
  • No Competent Person has done sufficient work to classify this historical estimate.

Evidence · table

“8.8”

Context: 113

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

inferredMt Wills Project · goldTonnes: 930000Grade: 3.5Grade Unit: g/tContained Metal: 106Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Wills Project
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
No
Resource group id
resource:30fa5595d04bccede89a
Deposit or zone
Sunnyside

Resource Data

Category
inferred
Tonnes
930000
Grade
3.5
Grade Unit
g/t
Contained Metal
106
Contained Unit
koz

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This historical Inferred resource provides context but is not compliant with current reporting standards and requires further work for verification, limiting its current utility.

Negative factors

  • This is a historical estimate not reported in accordance with the JORC Code.
  • Uncertainty that the historical estimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
  • No Competent Person has done sufficient work to classify this historical estimate.

Evidence · table

“3.5”

Context: 930

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

indicatedMt Wills Project · goldTonnes: 527000Grade: 6Grade Unit: g/tContained Metal: 101Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Wills Project
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
No
Resource group id
resource:5fbb08ca5e50f8dbf683
Deposit or zone
Total Indicated

Resource Data

Category
indicated
Tonnes
527000
Grade
6
Grade Unit
g/t
Contained Metal
101
Contained Unit
koz

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This historical Indicated resource provides context but is not compliant with current reporting standards and requires further work for verification, limiting its current utility.

Negative factors

  • This is a historical estimate not reported in accordance with the JORC Code.
  • Uncertainty that the historical estimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
  • No Competent Person has done sufficient work to classify this historical estimate.

Evidence · table

“6.0”

Context: 527

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

inferredMt Wills Project · goldTonnes: 1929000Grade: 3.5Grade Unit: g/tContained Metal: 218Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Wills Project
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
No
Resource group id
resource:20aead8bbc74862bfde5
Deposit or zone
Total Inferred

Resource Data

Category
inferred
Tonnes
1929000
Grade
3.5
Grade Unit
g/t
Contained Metal
218
Contained Unit
koz

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This historical Inferred resource provides context but is not compliant with current reporting standards and requires further work for verification, limiting its current utility.

Negative factors

  • This is a historical estimate not reported in accordance with the JORC Code.
  • Uncertainty that the historical estimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
  • No Competent Person has done sufficient work to classify this historical estimate.

Evidence · table

“3.5”

Context: 1,929

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

inferredMt Wills Project · goldTonnes: 2456000Grade: 4Grade Unit: g/tContained Metal: 320Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mt Wills Project
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
No
Resource group id
resource:d4380af9b1b8885e4f96
Deposit or zone
Total

Resource Data

Category
inferred
Tonnes
2456000
Grade
4
Grade Unit
g/t
Contained Metal
320
Contained Unit
koz

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: This historical resource provides context but is not compliant with current reporting standards and requires further work for verification, limiting its current utility.

Negative factors

  • This is a historical estimate not reported in accordance with the JORC Code.
  • Uncertainty that the historical estimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
  • No Competent Person has done sufficient work to classify this historical estimate.

Evidence · table

“4.0”

Context: 2,456

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Metallurgical Results (1)

leachPowers Gully surface stockpiles · goldRecovery: 98 %View all details
Link to this fact

Identity

Project
Powers Gully surface stockpiles
Commodity
gold
Region
australia_vic
Reported Region
Victoria, Australia
Ticker
RKB

Test Work

Program Status
preliminary
Test Type
leach
Processing Route
cyanide leaching
Sample
one sample from the upper part of the deposit

Recovery

Recovery
98 %
Recovery Basis
actual_test

Reagents

Reagent Notes
caustic soda pre-treatment

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-30T00:00:00.000Z

Reasoning: A very high recovery from preliminary test work is positive, but its representativeness is limited to a single sample and historical variability suggests further work is needed.

Positive factors

  • Very high gold recovery (98%) achieved in preliminary test work.

Negative factors

  • Test work is on a single sample, not representative of the entire deposit.
  • Historical test work showed variable recoveries, indicating potential variability.

Evidence · text

“recovered 98% of the gold using cyanide leaching with caustic soda pre-treatment”

Tags used in scoring

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 98% is at or above the exceptional band (95%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.