OZM: Quarterly Activities/Appendix 5B Cash Flow Report
Original announcement by asx on
- Company
- OzAurum Resources Ltd
- Ticker
- OZM
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Metallurgy, Permitting, Drill results, Resource update
- Extracted
- 2026-10-29 23:40:06 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
OzAurum Resources reported strong metallurgical results from its Mulgabbie North Gold Project, with column leach tests yielding up to 95% gold recovery from paleochannel material and 82% from saprolite/transition ore, confirming excellent heap leach amenability. The company also announced a high-grade drill intercept of 6m at 11.64 g/t gold, including 1m at 61.10 g/t gold, from a metallurgical diamond hole. Significant progress was made on permitting, with several key approvals granted for the Stage 1 heap leach operation, although site works and plant transport were delayed by record rainfall.
Reasoning: OzAurum Resources reported strong metallurgical results with high gold recoveries and rapid leach kinetics, alongside significant permitting and infrastructure advancements for its Mulgabbie North Gold Project. A high-grade gold intercept was also highlighted. While weather caused delays and some metallurgical results are preliminary, the overall progress is highly positive for the project's development pathway.
Positive factors
- High gold recoveries (up to 95%) from column leach testwork, crucial for project viability.
- Excellent leach kinetics reported for both column tests, supporting rapid gold production cycles.
- Significant progress on permitting, with multiple key approvals granted for the Stage 1 heap leach operation.
- Construction of production water bores completed, underpinning water requirements for Stage 1.
- High-grade gold intercept of 6m at 11.64 g/t Au, including 1m at 61.10 g/t Au, from a metallurgical diamond hole.
Negative factors
- Site civil works and plant transport delayed due to record rainfall and poor road conditions.
- Competent Person cautions that metallurgical results for MNODH 022 are preliminary and indicative only.
Facts used in scoring: 14

Classification and evidence
Heap Leach Routeneutral
Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
Why it applies: the document describes a heap_leach route ("heap leach")
Multi-Domain Testedpositive
Variability across ore domains (oxide, transition, fresh) has been addressed.
Why it applies: 2 distinct composites were tested
Extracted facts
Stored fact records: 14. Some facts used in scoring do not have a stored record.
Drill Results (2)
MNODH 022Mulgabbie North · goldGrade: 11.64Grade Unit: g/tIntercept: 6 mView all detailsHide details
Identity
- Hole ID
- MNODH 022
- Project
- Mulgabbie North
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- OZM
Geometry
- Grade
- 11.64
- Grade Unit
- g/t
- Intercept
- 6 m
- From
- 22 m
- To
- 28 m
- Intercept Depth
- 22 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- MNODH 022:22-28
- Mining Method
- open_pit
Location
- Location
- Paleochannel
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This high-grade gold intercept is exceptional for an open-pit deposit and provides strong support for the project's economic potential, particularly as it's from a metallurgical hole directly feeding into mine planning.
Positive factors
- High-grade gold intercept (11.64 g/t Au) is exceptional for an open-pit scenario.
- Strong grade-thickness product (69.84 g/t·m) indicates significant mineralization.
- Result is from a metallurgical diamond hole, providing valuable data for processing studies.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“6m @ 11.64 g/t Au including 1m @ 61.10 g/t Au (from 22m) MNODH 022”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Infill Drillingneutral
Confirmatory drilling to raise resource confidence, not new discovery.
Why it applies: drill_program_type is "resource"
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "The Salitre Project is adjacent to the Salitre and Serra Negra carbonatite complexes that host significant niobium and p"
MNODH 022Mulgabbie North · goldGrade: 61.1Grade Unit: g/tIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- MNODH 022
- Project
- Mulgabbie North
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- OZM
Geometry
- Grade
- 61.1
- Grade Unit
- g/t
- Intercept
- 1 m
- From
- 22 m
- To
- 23 m
- Intercept Depth
- 22 m
Classification
- Program
- resource
- Sample Type
- drill
- Group ID
- MNODH 022:22-23
- Mining Method
- open_pit
Location
- Location
- Paleochannel
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This bonanza-grade gold intercept is highly material and significantly enhances the project's potential, demonstrating very high-grade zones within the deposit.
Positive factors
- Bonanza grade gold intercept (61.10 g/t Au) is well above exceptional thresholds for any mining method.
- Strong grade-thickness product (61.10 g/t·m) indicates very high-grade mineralization.
- Result is from a metallurgical diamond hole, providing valuable data for processing studies.
Negative factors
- Apparent width only, true width not stated.
Evidence · text
“6m @ 11.64 g/t Au including 1m @ 61.10 g/t Au (from 22m) MNODH 022”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Infill Drillingneutral
Confirmatory drilling to raise resource confidence, not new discovery.
Why it applies: drill_program_type is "resource"
Nearology Playneutral
Value premise rests on proximity to a known deposit rather than own results.
Why it applies: proximity is offered as the value premise: "The Salitre Project is adjacent to the Salitre and Serra Negra carbonatite complexes that host significant niobium and p"
Resource Estimates (3)
measuredMulgabbie North Gold Deposit · goldTonnes: 1475000Grade: 0.82Grade Unit: g/tContained Metal: 39000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Deposit
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Andrew Pumphrey
- Resource group id
- resource:e26581298cb70dd567ea
Resource Data
- Category
- measured
- Tonnes
- 1475000
- Grade
- 0.82
- Grade Unit
- g/t
- Contained Metal
- 39000
- Contained Unit
- oz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-07-18
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-07-18T00:00:00.000Z
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical Measured resource estimate from 2023, providing background information rather than new data. The grade is relatively low.
Negative factors
- This is a historical resource estimate, not a new update.
- Low grade for a Measured resource (0.82 g/t Au).
Evidence · table
“0.82”
Context: 1,475,000
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.3 years before this release
indicatedMulgabbie North Gold Deposit · goldTonnes: 5620000Grade: 0.71Grade Unit: g/tContained Metal: 128000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Deposit
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Andrew Pumphrey
- Resource group id
- resource:47b93fe4be470f6f7934
Resource Data
- Category
- indicated
- Tonnes
- 5620000
- Grade
- 0.71
- Grade Unit
- g/t
- Contained Metal
- 128000
- Contained Unit
- oz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-07-18
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-07-18T00:00:00.000Z
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical Indicated resource estimate from 2023, providing background information rather than new data. The grade is relatively low.
Negative factors
- This is a historical resource estimate, not a new update.
- Low grade for an Indicated resource (0.71 g/t Au).
Evidence · table
“0.71”
Context: 5,620,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.3 years before this release
inferredMulgabbie North Gold Deposit · goldTonnes: 4543000Grade: 0.64Grade Unit: g/tContained Metal: 93000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Deposit
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Andrew Pumphrey
- Resource group id
- resource:a2f283371c14e68428c6
Resource Data
- Category
- inferred
- Tonnes
- 4543000
- Grade
- 0.64
- Grade Unit
- g/t
- Contained Metal
- 93000
- Contained Unit
- oz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2023-07-18
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-07-18T00:00:00.000Z
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a historical Inferred resource estimate from 2023, providing background information rather than new data. The grade is relatively low.
Negative factors
- This is a historical resource estimate, not a new update.
- Low grade for an Inferred resource (0.64 g/t Au).
Evidence · table
“0.64”
Context: 4,543,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.3 years before this release
Metallurgical Results (9)
column leachMulgabbie North Gold Project · goldRecovery: 95 %Head Grade: 2.58Head Grade Unit: g/tView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Test Work
- Program Status
- detailed
- Test Type
- column leach
- Processing Route
- heap leach
- Sample
- paleochannel material (from 21m to 29m down hole) from MNODH 022
- Grind P80
- 12000 µm
- Leach Time
- 2712 hours
Recovery
- Recovery
- 95 %
- Recovery Basis
- actual_test
- Head Grade
- 2.58
- Head Grade Unit
- g/t
Reagents
- Cyanide
- 0.26 kg/t
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The 95% gold recovery from paleochannel material is exceptional for a heap leach process and represents a significant de-risking of the project's metallurgical pathway, with rapid kinetics and low reagent consumption. This is a substantial improvement over previous results for the same material.
Positive factors
- Exceptional gold recovery (95%) for a heap leach operation, significantly de-risking the project.
- Very low cyanide consumption (0.26 kg/t) indicates efficient and cost-effective processing.
- Rapid leach kinetics (90% in 65 days) supports faster cash flow generation.
- Significant improvement over prior testwork for the same hole/material (95% vs 75%).
Negative factors
- Competent Person cautions that these results are preliminary and indicative only.
- Column leach is a bench-scale test, not pilot scale.
Evidence · text
“Final results from column 3 (drill hole MNODH 022) were received following quarter end. Column 3 reported excellent gold recovery of 95% from paleochannel material (21m to 29m down hole) crushed to -12mm. The column head grade was 2.58 g/t Au. Leaching was rapid, with more than 60% of the gold recovered within 15 days, more than 80% within 35 days and more than 90% within 65 days (see leach curve below). Cyanide consumption was very low at 0.26 kg/t”
column leachMulgabbie North Gold Project · goldRecovery: 82 %Head Grade: 1.35Head Grade Unit: g/tView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Test Work
- Program Status
- detailed
- Test Type
- column leach
- Processing Route
- heap leach
- Sample
- lower saprolite/transition gold ore (from 34m to 44m down hole) from MNODH 020
- Grind P80
- 12000 µm
Recovery
- Recovery
- 82 %
- Recovery Basis
- actual_test
- Head Grade
- 1.35
- Head Grade Unit
- g/t
Reagents
- Cyanide
- 0.21 kg/t
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The 82% gold recovery from saprolite/transition ore is exceptional for a heap leach process, demonstrating the amenability of different ore types to the planned processing route with low reagent consumption and rapid kinetics.
Positive factors
- Exceptional gold recovery (82%) for a heap leach operation, confirming amenability of transition ore.
- Very low cyanide consumption (0.21 kg/t) indicates efficient and cost-effective processing.
- Rapid leach kinetics (80% in 14 days) supports faster cash flow generation.
Negative factors
- Column leach is a bench-scale test, not pilot scale.
Evidence · text
“The final results for column 2 (MNODH 020) were received during the quarter and reported excellent gold recovery of 82% from lower saprolite/transition gold ore (34m to 44m down hole) crushed to -12mm. The head grade for this column was 1.35 g/t Au, with 60% of the gold recovered in seven days and 80% recovered in 14 days. Cyanide consumption is very low at 0.21 kg/t.”
lab testsMulgabbie North Gold Project · goldRecovery: 88 %View all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Test Work
- Program Status
- optimization
- Test Type
- lab tests
- Processing Route
- heap leach
- Sample
- lower saprolite/transition gold ore (from 34m to 44m down hole) from MNODH 020
- Grind P80
- 8000 µm
Recovery
- Recovery
- 88 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The indicated potential to increase recovery to 88% with finer crushing is a positive sign for further optimization and project economics, demonstrating flexibility in processing parameters.
Positive factors
- Potential for increased gold recovery (88%) by optimizing crush size, indicating further upside.
- Exceptional recovery for a heap leach process (88% > 75%).
Negative factors
- This is an indicated potential increase, not a confirmed result from a full column test.
- Column leach is a bench-scale test, not pilot scale.
Evidence · text
“Testwork indicates that using a crush size of -8mm, we could expect a potential increase in laboratory recovery to 88%. When we commence the heap leach project we intend to crush to -8mm”
Fact 4Mulgabbie North Gold Project · goldView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The approval of the Works Approval is a highly positive and material step, enabling the company to proceed with key processing activities for the Mulgabbie North project.
Positive factors
- Approval of Works Approval for crushing and heap leach processing is a critical step for project development.
- The approval covers a significant processing capacity (150,000 tonnes per year).
Evidence · text
“DWER – Works Approval crushing and heap leach processing 150,000 tonnes per year”
Fact 5Mulgabbie North Gold Project · goldView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The Dangerous Goods Licence approval is a necessary and positive step for the safe and compliant operation of the heap leach facility.
Positive factors
- Approval of the Dangerous Goods Licence is essential for handling reagents like cyanide in a heap leach operation.
Evidence · text
“DMPE – Dangerous Goods Licence”
Fact 6Mulgabbie North Gold Project · goldView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: Securing water abstraction approval is a highly material and positive development, addressing a fundamental requirement for the heap leach project.
Positive factors
- Approval for water abstraction (450,000 kL per year) secures a critical input for the heap leach operation.
Evidence · text
“DWER – Water abstraction 450,000kL per year”
Fact 7Mulgabbie North Gold Project · goldView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The environmental approval for mining development is a positive step, indicating regulatory acceptance for the project's scale.
Positive factors
- Environmental approval for small mining operations is a key regulatory milestone.
Evidence · text
“DMPE – Environmental Approval Mining Development <10ha Small Mining Operation”
Fact 8Mulgabbie North Gold Project · goldView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The approval of the Open Pit Mining Operational Notification is a positive step towards commencing mining operations.
Positive factors
- Open Pit Mining Operational Notification approval indicates readiness for mining activities.
Evidence · text
“DMPE – Open Pit Mining Operational Notification”
Fact 9Mulgabbie North Gold Project · goldView all detailsHide details
Identity
- Project
- Mulgabbie North Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OZM
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The lodgement of the Poisons Permit is a necessary step for the project, showing continued progress in regulatory compliance, though it is not yet approved.
Positive factors
- Lodgement of the Poisons Permit indicates progress towards full regulatory compliance for cyanide use.
Negative factors
- The permit is lodged, not yet approved.
Evidence · text
“The Poisons Permit has been lodged with the WA Department of Health.”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.