LGM: Quarterly Activities/Appendix 5B Cash Flow Report

Original announcement by asx on

Company
Legacy Minerals Holdings Limited
Ticker
LGM
Exchange
ASX
Region
New South Wales
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Resource update, Other
Extracted
2026-10-29 23:20:48 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Legacy Minerals reported a significant upgrade to the Mt Carrington Mineral Resource Estimate, increasing contained gold equivalent metal to 1.6 Moz and indicated resources by 69%. This updated resource forms the basis for a larger scoping study to assess increased processing plant throughput. Additionally, an updated Mineral Resource Estimate is underway for the NiCo Young project, which will include scandium for the first time.

Reasoning: Legacy Minerals announced a significant upgrade to the Mt Carrington Mineral Resource Estimate, increasing contained gold equivalent metal and indicated resources, which provides a stronger foundation for an expanded scoping study. An updated MRE is also underway for the NiCo Young project to include scandium, indicating future growth potential.

Positive factors

  • Significant increase in contained metal at Mt Carrington
  • Increased indicated resources at Mt Carrington
  • Progress on larger scoping study for Mt Carrington
  • Updated MRE for NiCo Young to include scandium
  • JORC compliant estimates
  • QP/CP signed estimates

Negative factors

  • Assays awaited for Emu and Mascotte drilling
  • Metal equivalent assumptions not disclosed for Mt Carrington AuEq
  • Metal equivalent assumptions not disclosed for NiCo Young NiEq
  • NiCo Young resource is currently only Inferred and historical

Facts used in scoring: 12

Atlas analysis — Legacy Minerals Holdings Limited: LGM: Quarterly Activities/Appendix 5B Cash Flow Report. indicated 47900000 tonnes

Classification and evidence

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The Mt Carrington MRE shows a 39% increase in total tonnes from 34,396 kt to 47,949 kt compared to the 2025 MRE.

Evidence · table

“+39%”

Context: Tonnes (kt)

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The Mt Carrington MRE shows a 9% increase in contained gold (from 652.5 koz to 714.3 koz) and a 44% increase in contained silver (from 24,294 koz to 34,991 koz) compared to the 2025 MRE.

Evidence · table

“+9%”

Context: Gold (koz Au)

Category Upgradepositive

Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.

Why it applies: Indicated Resources at Mt Carrington have increased by 69% since the 2025 MRE, materially improving resource confidence.

Evidence · text

“Indicated Resources have increased by 69% since the 2025 MRE”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The information in this announcement is based on information compiled by Thomas Wall and Kate Kitchen, both Competent Persons.

Evidence · text

“Thomas Wall, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Wall is the Technical Director and a full-time employee of Legacy Minerals Pty Limited, the Company’s wholly-owned subsidiary, and a shareholder of the Company. Mr Wall consents to the inclusion of the matters based on this information in the form and context in which it appears in this announcement. The information in this announcement that relates to the Mineral Resource Estimate for the Mt Carrington Project is extracted from the ASX announcement dated 30 July 2026 and is based on, and fairly represents, information and supporting documentation compiled by Kate Kitchen, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Kate Kitchen is an independent consultant employed full time by WSP Australia Pty Limited.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mt Carrington MRE is reported under JORC 2004/2012, and the NiCo Young MRE will be reported in accordance with the JORC Code 2012.

Evidence · text

“JORC 2004/2012”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The high-grade mineralisation component of the Mt Carrington MRE is reported with a cut-off of >1.9g/t AuEq.

Evidence · text

“cut-off >1.9g/t AuEq”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document announces a significant upgrade to the Mineral Resource Estimate for the Mt Carrington Project.

Evidence · text

“significant upgrade to the Mineral Resource Estimate (MRE) for the Mt Carrington Project”

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: A new Scoping Study is underway for the Mt Carrington Project to assess a larger-scale project based on the increased MRE.

Evidence · text

“New Scoping Study underway to assess a larger-scale Project based on the increased MRE”

Metal Equivalent Opaquenegative · Story-specific tag

Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.

Why it applies: The Mt Carrington gold-equivalent (AuEq) grade is reported without disclosing the price, recovery, or payability assumptions used.

Evidence · text

“1.6Moz gold-equivalent (AuEq)”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The NiCo Young Mineral Resource is currently reported as an Inferred category.

Evidence · text

“current Inferred Mineral Resource”

Historical Estimate Onlynegative

Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.

Why it applies: The NiCo Young MRE presented in Table 3 is the 'current Inferred Mineral Resource' and 'remains current until the updated MRE is reported', indicating it is a historical estimate in the context of the new MRE underway.

Evidence · text

“The current Inferred Mineral Resource, which reports nickel and cobalt onlyxxiii, is summarised in Table 3 below and remains current until the updated MRE is reported.”

Extracted facts

Stored fact records: 12. Some facts used in scoring do not have a stored record.

Resource Estimates (12)

indicatedMt Carrington · goldTonnes: 47900000Contained Metal: 1600000Contained Unit: koz aueqView all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:5873076104548d314396
Deposit or zone
Total Mineral Resource
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
47900000
Contained Metal
1600000
Contained Unit
koz aueq

Prior Estimate

Resource Date
2026-07-30
Prior Tonnes
34396000

Metal Equivalent

Metal Eq. Grade
1
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
No

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Mt Carrington MRE shows a substantial increase in contained gold equivalent metal, providing a stronger foundation for project development.

Positive factors

  • Significant increase in contained metal
  • JORC compliant
  • QP signed
  • Tonnage Growth

Negative factors

  • Metal equivalent assumptions not disclosed

Evidence · table

“1.0g/t AuEq”

Context: Total Mineral Resource

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 47900000 against 34396000 previously

indicatedMt Carrington · goldTonnes: 47900000Contained Metal: 714000Contained Unit: koz auView all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:5873076104548d314396
Deposit or zone
Total Mineral Resource
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
47900000
Contained Metal
714000
Contained Unit
koz au

Prior Estimate

Resource Date
2026-07-30
Prior Contained Metal
652500

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Mt Carrington MRE shows a substantial increase in contained gold, providing a stronger foundation for project development.

Positive factors

  • Significant increase in contained metal
  • JORC compliant
  • QP signed
  • Contained Metal Growth

Evidence · table

“714koz Au”

Context: Total Mineral Resource

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 714000 against 652500 previously

indicatedMt Carrington · silverTonnes: 47900000Contained Metal: 35Contained Unit: mozView all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:5873076104548d314396
Deposit or zone
Total Mineral Resource
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
47900000
Contained Metal
35
Contained Unit
moz

Prior Estimate

Resource Date
2026-07-30
Prior Contained Metal
24294000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Mt Carrington MRE shows a substantial increase in contained silver, providing a stronger foundation for project development.

Positive factors

  • Significant increase in contained metal
  • JORC compliant
  • QP signed
  • Contained Metal Growth

Evidence · table

“35Moz Ag”

Context: Total Mineral Resource

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 35 against 24294000 previously

indicatedMt Carrington · zincTonnes: 47900000Contained Metal: 164Contained Unit: kt znView all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:5873076104548d314396
Deposit or zone
Total Mineral Resource
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
47900000
Contained Metal
164
Contained Unit
kt zn

Prior Estimate

Resource Date
2026-07-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Mt Carrington MRE includes significant contained zinc, contributing to the overall project value.

Positive factors

  • Significant contained metal
  • JORC compliant
  • QP signed

Evidence · table

“164|40|37”

Context: Total Mineral Resource

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMt Carrington · copperTonnes: 47900000Contained Metal: 40Contained Unit: kt cuView all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:5873076104548d314396
Deposit or zone
Total Mineral Resource
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
47900000
Contained Metal
40
Contained Unit
kt cu

Prior Estimate

Resource Date
2026-07-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Mt Carrington MRE includes significant contained copper, contributing to the overall project value.

Positive factors

  • Significant contained metal
  • JORC compliant
  • QP signed

Evidence · table

“164|40|37”

Context: Total Mineral Resource

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMt Carrington · leadTonnes: 47900000Contained Metal: 37Contained Unit: kt pbView all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:5873076104548d314396
Deposit or zone
Total Mineral Resource
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
47900000
Contained Metal
37
Contained Unit
kt pb

Prior Estimate

Resource Date
2026-07-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Mt Carrington MRE includes significant contained lead, contributing to the overall project value.

Positive factors

  • Significant contained metal
  • JORC compliant
  • QP signed

Evidence · table

“164|40|37”

Context: Total Mineral Resource

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMt Carrington · goldTonnes: 5030000Contained Metal: 493000Contained Unit: koz aueqView all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:c0ce2c0f0405660fee31
Deposit or zone
High-grade mineralisation
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
5030000
Contained Metal
493000
Contained Unit
koz aueq
Cutoff Grade
1.9
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2026-07-30

Metal Equivalent

Metal Eq. Grade
3.1
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
No

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: Identification of a significant high-grade component within the Mt Carrington MRE enhances the project's economic potential.

Positive factors

  • High-grade component identified
  • Cut-off grade disclosed
  • JORC compliant
  • QP signed

Negative factors

  • Metal equivalent assumptions not disclosed

Evidence · text

“493koz AuEq at 3.1g/t AuEq (cut-off >1.9g/t AuEq) [5.03 Mt]”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMt Carrington · goldTonnes: 19300000View all details
Link to this fact

Identity

Project
Mt Carrington
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall, Kate Kitchen
Resource group id
resource:93bef4422888402d361d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
19300000

Prior Estimate

Resource Date
2026-07-30
Prior Tonnes
11420118

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The 69% increase in indicated resources at Mt Carrington materially improves resource confidence and provides a stronger foundation for the scoping study.

Positive factors

  • Significant increase in indicated resources
  • Improved resource confidence
  • JORC compliant
  • QP signed
  • Category Upgrade

Evidence · text

“19.3Mt Indicated (40%)”

Context: Indicated Resources have increased by 69% since the 2025 MRE, with the updated MRE now totalling 19.3Mt Indicated (40%)

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 19300000 against 11420118 previously

inferredNiCo Young · nickelTonnes: 167800000Grade: 0.59Grade Unit: %Contained Metal: 996.7Contained Unit: kt niHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
NiCo Young
Commodity
nickel
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall
Resource group id
resource:bb7f8e5e8a6654b7d2fe
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
167800000
Grade
0.59
Grade Unit
%
Contained Metal
996.7
Contained Unit
kt ni
Cutoff Grade
0.6
Cutoff Unit
% NiEq

Prior Estimate

Resource Date
2025-07-01

Metal Equivalent

Metal Eq. Grade
0.6
Metal Eq. Unit
% NiEq
Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-07-01T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: These are the current inferred resource figures for NiCo Young, which are historical as an updated MRE is underway, but still represent a significant nickel deposit.

Positive factors

  • Large contained nickel
  • JORC compliant
  • QP signed

Negative factors

  • Inferred category only
  • Historical estimate
  • Metal equivalent assumptions not disclosed

Evidence · table

“0.59”

Context: 0.6% NiEq

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredNiCo Young · cobaltTonnes: 167800000Grade: 0.06Grade Unit: %Contained Metal: 96.6Contained Unit: kt coHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
NiCo Young
Commodity
cobalt
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall
Resource group id
resource:bb7f8e5e8a6654b7d2fe
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
167800000
Grade
0.06
Grade Unit
%
Contained Metal
96.6
Contained Unit
kt co
Cutoff Grade
0.6
Cutoff Unit
% NiEq

Prior Estimate

Resource Date
2025-07-01

Metal Equivalent

Metal Eq. Grade
0.6
Metal Eq. Unit
% NiEq
Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-07-01T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: These are the current inferred resource figures for NiCo Young, which are historical as an updated MRE is underway, but still represent a significant cobalt deposit.

Positive factors

  • Large contained cobalt
  • JORC compliant
  • QP signed

Negative factors

  • Inferred category only
  • Historical estimate
  • Metal equivalent assumptions not disclosed

Evidence · table

“0.06”

Context: 0.6% NiEq

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredNiCo Young · nickelTonnes: 42500000Grade: 0.8Grade Unit: %Contained Metal: 338.8Contained Unit: kt niHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
NiCo Young
Commodity
nickel
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall
Resource group id
resource:9109a6c2b662a97b0990
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
42500000
Grade
0.8
Grade Unit
%
Contained Metal
338.8
Contained Unit
kt ni
Cutoff Grade
1
Cutoff Unit
% NiEq

Prior Estimate

Resource Date
2025-07-01

Metal Equivalent

Metal Eq. Grade
1
Metal Eq. Unit
% NiEq
Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-07-01T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: These are the current inferred resource figures for NiCo Young, which are historical as an updated MRE is underway, but still represent a significant nickel deposit.

Positive factors

  • Significant contained nickel
  • JORC compliant
  • QP signed

Negative factors

  • Inferred category only
  • Historical estimate
  • Metal equivalent assumptions not disclosed

Evidence · table

“0.80”

Context: 1.0% NiEq

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredNiCo Young · cobaltTonnes: 42500000Grade: 0.09Grade Unit: %Contained Metal: 38Contained Unit: kt coHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
NiCo Young
Commodity
cobalt
Region
australia_nsw
Reported Region
New South Wales
Ticker
LGM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Thomas Wall
Resource group id
resource:9109a6c2b662a97b0990
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
42500000
Grade
0.09
Grade Unit
%
Contained Metal
38
Contained Unit
kt co
Cutoff Grade
1
Cutoff Unit
% NiEq

Prior Estimate

Resource Date
2025-07-01

Metal Equivalent

Metal Eq. Grade
1
Metal Eq. Unit
% NiEq
Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-07-01T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: These are the current inferred resource figures for NiCo Young, which are historical as an updated MRE is underway, but still represent a significant cobalt deposit.

Positive factors

  • Significant contained cobalt
  • JORC compliant
  • QP signed

Negative factors

  • Inferred category only
  • Historical estimate
  • Metal equivalent assumptions not disclosed

Evidence · table

“0.09”

Context: 1.0% NiEq

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.