CHW: Nakombe Niobium-Yttrium Assays Strengthen Discovery

Original announcement by asx on

Company
Chilwa Minerals Limited
Ticker
CHW
Exchange
ASX
Region
Southern Malawi
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Drill results
Extracted
2026-10-29 23:32:31 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Chilwa Minerals Limited announced strong ICP-MS laboratory assay results from drilling at its Nakombe Niobium-Yttrium REE target, confirming high-grade niobium mineralization from surface, including 57 metres at 0.315% Nb₂O₅ in MPYDD009 and 22 metres at 0.243% Nb₂O₅ in MPYDD015. These results, which also highlight significant yttrium-rich rare earth, tantalum, and gallium co-enrichment, supersede previous pXRF data with an uplift in grades and confirm continuity of the mineralized system over a 270-meter strike length. The company is progressing an infill drilling program to underpin a maiden Mineral Resource Estimate planned for May-June 2027, with mineralization remaining open at depth and along strike.

Reasoning: New ICP-MS laboratory assays confirm high-grade niobium, rare earth, tantalum, and gallium mineralization, showing continuity over 270m strike and an uplift in grades compared to prior pXRF results, positioning the project for a maiden MRE, despite true widths not being known and potential refractory issues.

Positive factors

  • High-grade niobium intercepts, including 14 metres at 0.426% Nb₂O₅, which is strong for the commodity.
  • New ICP-MS laboratory assays returned higher grades than previously reported pXRF results, indicating an uplift in grade.
  • Confirmation of continuity of the mineralised system across a 270-metre strike length.
  • Mineralisation remains open at depth, to the east and north, indicating further exploration potential.
  • Significant yttrium-rich rare earth basket, with a bonanza intercept of 0.8% TREO over 1.3 metres, and co-enrichment of tantalum and gallium.
  • Progress towards a maiden Mineral Resource Estimate (MRE) with an infill drilling program underway.
  • Comprehensive QA/QC procedures, including certified reference materials, blanks, and duplicates, are disclosed, and a Competent Person has signed off.

Negative factors

  • True widths of the mineralised intercepts are not yet known, which may overstate actual thickness.
  • Digestion of refractory niobium-bearing phases may be incomplete, potentially leading to conservative grade reporting and indicating processing challenges.

Facts used in scoring: 37

Atlas analysis — Chilwa Minerals Limited: CHW: Nakombe Niobium-Yttrium Assays Strengthen Discovery. 0.32 % over 57 m; 0.22 % over 10 m; 0.22 % over 8.05 m

Extracted facts

Stored fact records: 37. Some facts used in scoring do not have a stored record.

Drill Results (37)

MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.32Grade Unit: %Intercept: 57 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.32
Grade Unit
%
Intercept
57 m
From
0 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
0 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:0-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a strong, near-surface niobium intercept with improved grades from new assays, contributing positively to the project's potential, though true width is unknown and refractory issues are noted.

Positive factors

  • High-grade niobium intercept from surface, exceeding the project's average grade.
  • New ICP-MS assays show an uplift in grade compared to previous pXRF results.
  • Intercept is from surface, indicating potential for open-pit mining.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.32”

Context: 57.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1582Grade Unit: ppmIntercept: 57 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1582
Grade Unit
ppm
Intercept
57 m
From
0 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
0 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:0-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept from surface, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept from surface, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,582”

Context: 57.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 173.9Grade Unit: ppmIntercept: 57 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
173.9
Grade Unit
ppm
Intercept
57 m
From
0 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
0 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:0-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“173.9”

Context: 57.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 61Grade Unit: ppmIntercept: 57 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
61
Grade Unit
ppm
Intercept
57 m
From
0 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
0 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:0-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“61.0”

Context: 57.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.43Grade Unit: %Intercept: 14 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.43
Grade Unit
%
Intercept
14 m
From
43 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
43 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:43-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.3
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is an exceptional, high-grade niobium intercept with improved grades from new assays, significantly enhancing the project's potential, though true width is unknown and refractory issues are noted.

Positive factors

  • High-grade niobium intercept, significantly above the project's average grade and the higher cut-off.
  • New ICP-MS assays show an uplift in grade compared to previous pXRF results.
  • Intercept is near-surface, indicating potential for open-pit mining.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.43”

Context: 14.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Bonanza InterceptRejected · positive

Exceptionally high-grade zone, well above the deposit-type norm.

Reason: The grade of 0.43% Nb₂O₅ is well above the strong threshold for niobium (0.25%) and is a significant high-grade zone.

Evidence · table

“0.43”

Context: 14.00

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1542Grade Unit: ppmIntercept: 14 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1542
Grade Unit
ppm
Intercept
14 m
From
43 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
43 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:43-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.3
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept near-surface, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept near-surface, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,542”

Context: 14.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 240.7Grade Unit: ppmIntercept: 14 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
240.7
Grade Unit
ppm
Intercept
14 m
From
43 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
43 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:43-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.3
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows strong tantalum co-enrichment with elevated grades, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Elevated tantalum grades, higher than the project's average, indicating strong co-enrichment.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“240.7”

Context: 14.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 59.2Grade Unit: ppmIntercept: 14 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
59.2
Grade Unit
ppm
Intercept
14 m
From
43 m
To
57 m
Hole Depth
385.5 m
Intercept Depth
43 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:43-57
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.3
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows strong gallium co-enrichment with elevated grades, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Elevated gallium grades, higher than the project's average, indicating strong co-enrichment.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“59.2”

Context: 14.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.22
Grade Unit
%
Intercept
10 m
From
85 m
To
95 m
Hole Depth
385.5 m
Intercept Depth
85 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:85-95
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.

Positive factors

  • Good grade niobium intercept, above the stated cut-off.
  • New ICP-MS assays provide reliable data.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.22”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 2017Grade Unit: ppmIntercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
2017
Grade Unit
ppm
Intercept
10 m
From
85 m
To
95 m
Hole Depth
385.5 m
Intercept Depth
85 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:85-95
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept, above the project's average grade, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“2,017”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 112.3Grade Unit: ppmIntercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
112.3
Grade Unit
ppm
Intercept
10 m
From
85 m
To
95 m
Hole Depth
385.5 m
Intercept Depth
85 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:85-95
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“112.3”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 43.5Grade Unit: ppmIntercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
43.5
Grade Unit
ppm
Intercept
10 m
From
85 m
To
95 m
Hole Depth
385.5 m
Intercept Depth
85 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:85-95
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“43.5”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 8.05 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.22
Grade Unit
%
Intercept
8.05 m
From
100.45 m
To
108.5 m
Hole Depth
385.5 m
Intercept Depth
100.45 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:100.45-108.5
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.

Positive factors

  • Good grade niobium intercept, above the stated cut-off.
  • New ICP-MS assays provide reliable data.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.22”

Context: 8.05

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1388Grade Unit: ppmIntercept: 8.05 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1388
Grade Unit
ppm
Intercept
8.05 m
From
100.45 m
To
108.5 m
Hole Depth
385.5 m
Intercept Depth
100.45 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:100.45-108.5
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,388”

Context: 8.05

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 114.9Grade Unit: ppmIntercept: 8.05 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
114.9
Grade Unit
ppm
Intercept
8.05 m
From
100.45 m
To
108.5 m
Hole Depth
385.5 m
Intercept Depth
100.45 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:100.45-108.5
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“114.9”

Context: 8.05

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 42.5Grade Unit: ppmIntercept: 8.05 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
42.5
Grade Unit
ppm
Intercept
8.05 m
From
100.45 m
To
108.5 m
Hole Depth
385.5 m
Intercept Depth
100.45 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:100.45-108.5
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“42.5”

Context: 8.05

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 8000Grade Unit: ppmIntercept: 1.3 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
8000
Grade Unit
ppm
Intercept
1.3 m
From
111.15 m
To
112.45 m
Hole Depth
385.5 m
Intercept Depth
111.15 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:111.15-112.45
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is an exceptional, bonanza-grade rare earth intercept, significantly enhancing the project's rare earth potential, with new reliable assay data, though true width is unknown and the interval is narrow.

Positive factors

  • Exceptional high-grade rare earth (TREO) intercept, significantly exceeding the project's average and prior best intercepts.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • The interval is relatively narrow.

Evidence · text

“TREO values peak at 0.8% TREO in a single 1.3m interval from 111.15 to 112.45m downhole on MPYDD009”

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Bonanza InterceptRejected · positive

Exceptionally high-grade zone, well above the deposit-type norm.

Reason: The grade of 0.8% TREO (8000 ppm) is significantly higher than the project's average and prior best intercepts for rare earths, indicating an exceptionally high-grade zone.

Evidence · text

“TREO values peak at 0.8% TREO in a single 1.3m interval from 111.15 to 112.45m downhole on MPYDD009”

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.26Grade Unit: %Intercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.26
Grade Unit
%
Intercept
4 m
From
116 m
To
120 m
Hole Depth
385.5 m
Intercept Depth
116 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:116-120
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.

Positive factors

  • Good grade niobium intercept, above the stated cut-off.
  • New ICP-MS assays provide reliable data.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.26”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1508Grade Unit: ppmIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1508
Grade Unit
ppm
Intercept
4 m
From
116 m
To
120 m
Hole Depth
385.5 m
Intercept Depth
116 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:116-120
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,508”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 123.8Grade Unit: ppmIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
123.8
Grade Unit
ppm
Intercept
4 m
From
116 m
To
120 m
Hole Depth
385.5 m
Intercept Depth
116 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:116-120
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“123.8”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 42.8Grade Unit: ppmIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
42.8
Grade Unit
ppm
Intercept
4 m
From
116 m
To
120 m
Hole Depth
385.5 m
Intercept Depth
116 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:116-120
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“42.8”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.26Grade Unit: %Intercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.26
Grade Unit
%
Intercept
10 m
From
130 m
To
140 m
Hole Depth
385.5 m
Intercept Depth
130 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:130-140
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.

Positive factors

  • Good grade niobium intercept, above the stated cut-off.
  • New ICP-MS assays provide reliable data.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.26”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1964Grade Unit: ppmIntercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1964
Grade Unit
ppm
Intercept
10 m
From
130 m
To
140 m
Hole Depth
385.5 m
Intercept Depth
130 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:130-140
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept, above the project's average grade, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,964”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 127.4Grade Unit: ppmIntercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
127.4
Grade Unit
ppm
Intercept
10 m
From
130 m
To
140 m
Hole Depth
385.5 m
Intercept Depth
130 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:130-140
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“127.4”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 45.1Grade Unit: ppmIntercept: 10 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
45.1
Grade Unit
ppm
Intercept
10 m
From
130 m
To
140 m
Hole Depth
385.5 m
Intercept Depth
130 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:130-140
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“45.1”

Context: 10.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 25.1 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.22
Grade Unit
%
Intercept
25.1 m
From
150 m
To
175.1 m
Hole Depth
385.5 m
Intercept Depth
150 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:150-175.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a solid niobium intercept over a good width with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.

Positive factors

  • Good grade niobium intercept over a significant width, above the stated cut-off.
  • New ICP-MS assays provide reliable data.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.22”

Context: 25.10

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1475Grade Unit: ppmIntercept: 25.1 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1475
Grade Unit
ppm
Intercept
25.1 m
From
150 m
To
175.1 m
Hole Depth
385.5 m
Intercept Depth
150 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:150-175.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept over a good width, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept over a good width, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,475”

Context: 25.10

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 115.3Grade Unit: ppmIntercept: 25.1 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
115.3
Grade Unit
ppm
Intercept
25.1 m
From
150 m
To
175.1 m
Hole Depth
385.5 m
Intercept Depth
150 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:150-175.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“115.3”

Context: 25.10

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 44.2Grade Unit: ppmIntercept: 25.1 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
44.2
Grade Unit
ppm
Intercept
25.1 m
From
150 m
To
175.1 m
Hole Depth
385.5 m
Intercept Depth
150 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:150-175.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“44.2”

Context: 25.10

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.27Grade Unit: %Intercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.27
Grade Unit
%
Intercept
4 m
From
183.1 m
To
187.1 m
Hole Depth
385.5 m
Intercept Depth
183.1 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:183.1-187.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.

Positive factors

  • Good grade niobium intercept, above the stated cut-off.
  • New ICP-MS assays provide reliable data.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.27”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1371Grade Unit: ppmIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1371
Grade Unit
ppm
Intercept
4 m
From
183.1 m
To
187.1 m
Hole Depth
385.5 m
Intercept Depth
183.1 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:183.1-187.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,371”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 146.9Grade Unit: ppmIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
146.9
Grade Unit
ppm
Intercept
4 m
From
183.1 m
To
187.1 m
Hole Depth
385.5 m
Intercept Depth
183.1 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:183.1-187.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“146.9”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 44.6Grade Unit: ppmIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
44.6
Grade Unit
ppm
Intercept
4 m
From
183.1 m
To
187.1 m
Hole Depth
385.5 m
Intercept Depth
183.1 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:183.1-187.1
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“44.6”

Context: 4.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 15 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
niobium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
0.22
Grade Unit
%
Intercept
15 m
From
189 m
To
204 m
Hole Depth
385.5 m
Intercept Depth
189 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:189-204
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a solid niobium intercept over a good width with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.

Positive factors

  • Good grade niobium intercept over a significant width, above the stated cut-off.
  • New ICP-MS assays provide reliable data.

Negative factors

  • True width is not known, which may overstate the actual thickness.
  • Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.

Evidence · table

“0.22”

Context: 15.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1558Grade Unit: ppmIntercept: 15 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
rare_earths
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
1558
Grade Unit
ppm
Intercept
15 m
From
189 m
To
204 m
Hole Depth
385.5 m
Intercept Depth
189 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:189-204
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a good rare earth intercept over a good width, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.

Positive factors

  • Significant rare earth (TREO) intercept over a good width, indicating potential for co-product recovery.
  • New ICP-MS assays provide reliable data for rare earth distribution.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“1,558”

Context: 15.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 115.7Grade Unit: ppmIntercept: 15 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
tantalum
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
115.7
Grade Unit
ppm
Intercept
15 m
From
189 m
To
204 m
Hole Depth
385.5 m
Intercept Depth
189 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:189-204
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for tantalum grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“115.7”

Context: 15.00

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

Refractory OreRejected · negative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that true widths are not known for the reported intercepts.

Evidence · text

“Downhole lengths; true widths not known.”

Deleterious Elements PresentRejected · negative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.

Evidence · text

“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 45.7Grade Unit: ppmIntercept: 15 mView all details
Link to this fact

Identity

Hole ID
MPYDD009
Project
confirms continuity of the mineralised
Commodity
gallium
Region
southern malawi
Reported Region
southern malawi
Ticker
CHW

Geometry

Grade
45.7
Grade Unit
ppm
Intercept
15 m
From
189 m
To
204 m
Hole Depth
385.5 m
Intercept Depth
189 m

Classification

Program
exploration
Sample Type
drill
Group ID
MPYDD009:189-204
Mining Method
unknown

Location

Easting
770876
Northing
8295165
CRS
WGS1984/UTM Zone 36S
Elevation
645 m
Azimuth
180 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
UIS Analytical Services
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
Yes

Compositing

Cutoff Grade
0.2
Cutoff Unit
% Nb₂O₅
Dilution Disclosed
Yes
Max Dilution
4 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.

Positive factors

  • Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
  • New ICP-MS assays provide reliable data for gallium grades.

Negative factors

  • True width is not known, which may overstate the actual thickness.

Evidence · table

“45.7”

Context: 15.00

Tags used in scoring

Deleterious Elements Presentnegative

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Why it applies: deleterious_flag is true

Refractory Orenegative

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Why it applies: the release describes refractory metallurgy

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Step-Out ExtensionRejected · positive

Mineralization extended beyond the previously known limit.

Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.

Evidence · text

“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”

QA/QC DisclosedRejected · positive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.

Evidence · text

“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”

Compositing TransparentRejected · positive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.

Evidence · text

“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.