CHW: Nakombe Niobium-Yttrium Assays Strengthen Discovery
Original announcement by asx on
- Company
- Chilwa Minerals Limited
- Ticker
- CHW
- Exchange
- ASX
- Region
- Southern Malawi
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Drill results
- Extracted
- 2026-10-29 23:32:31 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Chilwa Minerals Limited announced strong ICP-MS laboratory assay results from drilling at its Nakombe Niobium-Yttrium REE target, confirming high-grade niobium mineralization from surface, including 57 metres at 0.315% Nb₂O₅ in MPYDD009 and 22 metres at 0.243% Nb₂O₅ in MPYDD015. These results, which also highlight significant yttrium-rich rare earth, tantalum, and gallium co-enrichment, supersede previous pXRF data with an uplift in grades and confirm continuity of the mineralized system over a 270-meter strike length. The company is progressing an infill drilling program to underpin a maiden Mineral Resource Estimate planned for May-June 2027, with mineralization remaining open at depth and along strike.
Reasoning: New ICP-MS laboratory assays confirm high-grade niobium, rare earth, tantalum, and gallium mineralization, showing continuity over 270m strike and an uplift in grades compared to prior pXRF results, positioning the project for a maiden MRE, despite true widths not being known and potential refractory issues.
Positive factors
- High-grade niobium intercepts, including 14 metres at 0.426% Nb₂O₅, which is strong for the commodity.
- New ICP-MS laboratory assays returned higher grades than previously reported pXRF results, indicating an uplift in grade.
- Confirmation of continuity of the mineralised system across a 270-metre strike length.
- Mineralisation remains open at depth, to the east and north, indicating further exploration potential.
- Significant yttrium-rich rare earth basket, with a bonanza intercept of 0.8% TREO over 1.3 metres, and co-enrichment of tantalum and gallium.
- Progress towards a maiden Mineral Resource Estimate (MRE) with an infill drilling program underway.
- Comprehensive QA/QC procedures, including certified reference materials, blanks, and duplicates, are disclosed, and a Competent Person has signed off.
Negative factors
- True widths of the mineralised intercepts are not yet known, which may overstate actual thickness.
- Digestion of refractory niobium-bearing phases may be incomplete, potentially leading to conservative grade reporting and indicating processing challenges.
Facts used in scoring: 37

Extracted facts
Stored fact records: 37. Some facts used in scoring do not have a stored record.
Drill Results (37)
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.32Grade Unit: %Intercept: 57 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.32
- Grade Unit
- %
- Intercept
- 57 m
- From
- 0 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 0 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:0-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a strong, near-surface niobium intercept with improved grades from new assays, contributing positively to the project's potential, though true width is unknown and refractory issues are noted.
Positive factors
- High-grade niobium intercept from surface, exceeding the project's average grade.
- New ICP-MS assays show an uplift in grade compared to previous pXRF results.
- Intercept is from surface, indicating potential for open-pit mining.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.32”
Context: 57.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1582Grade Unit: ppmIntercept: 57 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1582
- Grade Unit
- ppm
- Intercept
- 57 m
- From
- 0 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 0 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:0-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept from surface, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept from surface, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,582”
Context: 57.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 173.9Grade Unit: ppmIntercept: 57 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 173.9
- Grade Unit
- ppm
- Intercept
- 57 m
- From
- 0 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 0 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:0-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“173.9”
Context: 57.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 61Grade Unit: ppmIntercept: 57 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 61
- Grade Unit
- ppm
- Intercept
- 57 m
- From
- 0 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 0 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:0-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“61.0”
Context: 57.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.43Grade Unit: %Intercept: 14 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.43
- Grade Unit
- %
- Intercept
- 14 m
- From
- 43 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 43 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:43-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 2 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is an exceptional, high-grade niobium intercept with improved grades from new assays, significantly enhancing the project's potential, though true width is unknown and refractory issues are noted.
Positive factors
- High-grade niobium intercept, significantly above the project's average grade and the higher cut-off.
- New ICP-MS assays show an uplift in grade compared to previous pXRF results.
- Intercept is near-surface, indicating potential for open-pit mining.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.43”
Context: 14.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: The grade of 0.43% Nb₂O₅ is well above the strong threshold for niobium (0.25%) and is a significant high-grade zone.
Evidence · table
“0.43”
Context: 14.00
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1542Grade Unit: ppmIntercept: 14 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1542
- Grade Unit
- ppm
- Intercept
- 14 m
- From
- 43 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 43 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:43-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 2 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept near-surface, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept near-surface, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,542”
Context: 14.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 240.7Grade Unit: ppmIntercept: 14 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 240.7
- Grade Unit
- ppm
- Intercept
- 14 m
- From
- 43 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 43 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:43-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 2 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows strong tantalum co-enrichment with elevated grades, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Elevated tantalum grades, higher than the project's average, indicating strong co-enrichment.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“240.7”
Context: 14.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 59.2Grade Unit: ppmIntercept: 14 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 59.2
- Grade Unit
- ppm
- Intercept
- 14 m
- From
- 43 m
- To
- 57 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 43 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:43-57
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.3
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 2 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows strong gallium co-enrichment with elevated grades, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Elevated gallium grades, higher than the project's average, indicating strong co-enrichment.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“59.2”
Context: 14.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.3% Nb₂O₅ and up to 2 m consecutive internal dilution for 'incl' intervals.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.22
- Grade Unit
- %
- Intercept
- 10 m
- From
- 85 m
- To
- 95 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 85 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:85-95
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.
Positive factors
- Good grade niobium intercept, above the stated cut-off.
- New ICP-MS assays provide reliable data.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.22”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 2017Grade Unit: ppmIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 2017
- Grade Unit
- ppm
- Intercept
- 10 m
- From
- 85 m
- To
- 95 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 85 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:85-95
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept, above the project's average grade, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“2,017”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 112.3Grade Unit: ppmIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 112.3
- Grade Unit
- ppm
- Intercept
- 10 m
- From
- 85 m
- To
- 95 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 85 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:85-95
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“112.3”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 43.5Grade Unit: ppmIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 43.5
- Grade Unit
- ppm
- Intercept
- 10 m
- From
- 85 m
- To
- 95 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 85 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:85-95
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“43.5”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 8.05 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.22
- Grade Unit
- %
- Intercept
- 8.05 m
- From
- 100.45 m
- To
- 108.5 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 100.45 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:100.45-108.5
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.
Positive factors
- Good grade niobium intercept, above the stated cut-off.
- New ICP-MS assays provide reliable data.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.22”
Context: 8.05
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1388Grade Unit: ppmIntercept: 8.05 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1388
- Grade Unit
- ppm
- Intercept
- 8.05 m
- From
- 100.45 m
- To
- 108.5 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 100.45 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:100.45-108.5
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,388”
Context: 8.05
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 114.9Grade Unit: ppmIntercept: 8.05 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 114.9
- Grade Unit
- ppm
- Intercept
- 8.05 m
- From
- 100.45 m
- To
- 108.5 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 100.45 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:100.45-108.5
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“114.9”
Context: 8.05
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 42.5Grade Unit: ppmIntercept: 8.05 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 42.5
- Grade Unit
- ppm
- Intercept
- 8.05 m
- From
- 100.45 m
- To
- 108.5 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 100.45 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:100.45-108.5
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“42.5”
Context: 8.05
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 8000Grade Unit: ppmIntercept: 1.3 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 8000
- Grade Unit
- ppm
- Intercept
- 1.3 m
- From
- 111.15 m
- To
- 112.45 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 111.15 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:111.15-112.45
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is an exceptional, bonanza-grade rare earth intercept, significantly enhancing the project's rare earth potential, with new reliable assay data, though true width is unknown and the interval is narrow.
Positive factors
- Exceptional high-grade rare earth (TREO) intercept, significantly exceeding the project's average and prior best intercepts.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
- The interval is relatively narrow.
Evidence · text
“TREO values peak at 0.8% TREO in a single 1.3m interval from 111.15 to 112.45m downhole on MPYDD009”
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Bonanza InterceptRejected · positive
Exceptionally high-grade zone, well above the deposit-type norm.
Reason: The grade of 0.8% TREO (8000 ppm) is significantly higher than the project's average and prior best intercepts for rare earths, indicating an exceptionally high-grade zone.
Evidence · text
“TREO values peak at 0.8% TREO in a single 1.3m interval from 111.15 to 112.45m downhole on MPYDD009”
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.26Grade Unit: %Intercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.26
- Grade Unit
- %
- Intercept
- 4 m
- From
- 116 m
- To
- 120 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 116 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:116-120
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.
Positive factors
- Good grade niobium intercept, above the stated cut-off.
- New ICP-MS assays provide reliable data.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.26”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1508Grade Unit: ppmIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1508
- Grade Unit
- ppm
- Intercept
- 4 m
- From
- 116 m
- To
- 120 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 116 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:116-120
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,508”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 123.8Grade Unit: ppmIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 123.8
- Grade Unit
- ppm
- Intercept
- 4 m
- From
- 116 m
- To
- 120 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 116 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:116-120
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“123.8”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 42.8Grade Unit: ppmIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 42.8
- Grade Unit
- ppm
- Intercept
- 4 m
- From
- 116 m
- To
- 120 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 116 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:116-120
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“42.8”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.26Grade Unit: %Intercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.26
- Grade Unit
- %
- Intercept
- 10 m
- From
- 130 m
- To
- 140 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 130 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:130-140
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.
Positive factors
- Good grade niobium intercept, above the stated cut-off.
- New ICP-MS assays provide reliable data.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.26”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1964Grade Unit: ppmIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1964
- Grade Unit
- ppm
- Intercept
- 10 m
- From
- 130 m
- To
- 140 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 130 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:130-140
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept, above the project's average grade, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,964”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 127.4Grade Unit: ppmIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 127.4
- Grade Unit
- ppm
- Intercept
- 10 m
- From
- 130 m
- To
- 140 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 130 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:130-140
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“127.4”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 45.1Grade Unit: ppmIntercept: 10 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 45.1
- Grade Unit
- ppm
- Intercept
- 10 m
- From
- 130 m
- To
- 140 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 130 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:130-140
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“45.1”
Context: 10.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 25.1 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.22
- Grade Unit
- %
- Intercept
- 25.1 m
- From
- 150 m
- To
- 175.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 150 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:150-175.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a solid niobium intercept over a good width with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.
Positive factors
- Good grade niobium intercept over a significant width, above the stated cut-off.
- New ICP-MS assays provide reliable data.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.22”
Context: 25.10
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1475Grade Unit: ppmIntercept: 25.1 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1475
- Grade Unit
- ppm
- Intercept
- 25.1 m
- From
- 150 m
- To
- 175.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 150 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:150-175.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept over a good width, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept over a good width, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,475”
Context: 25.10
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 115.3Grade Unit: ppmIntercept: 25.1 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 115.3
- Grade Unit
- ppm
- Intercept
- 25.1 m
- From
- 150 m
- To
- 175.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 150 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:150-175.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“115.3”
Context: 25.10
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 44.2Grade Unit: ppmIntercept: 25.1 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 44.2
- Grade Unit
- ppm
- Intercept
- 25.1 m
- From
- 150 m
- To
- 175.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 150 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:150-175.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“44.2”
Context: 25.10
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.27Grade Unit: %Intercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.27
- Grade Unit
- %
- Intercept
- 4 m
- From
- 183.1 m
- To
- 187.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 183.1 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:183.1-187.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a solid niobium intercept with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.
Positive factors
- Good grade niobium intercept, above the stated cut-off.
- New ICP-MS assays provide reliable data.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.27”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1371Grade Unit: ppmIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1371
- Grade Unit
- ppm
- Intercept
- 4 m
- From
- 183.1 m
- To
- 187.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 183.1 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:183.1-187.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,371”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 146.9Grade Unit: ppmIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 146.9
- Grade Unit
- ppm
- Intercept
- 4 m
- From
- 183.1 m
- To
- 187.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 183.1 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:183.1-187.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“146.9”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 44.6Grade Unit: ppmIntercept: 4 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 44.6
- Grade Unit
- ppm
- Intercept
- 4 m
- From
- 183.1 m
- To
- 187.1 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 183.1 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:183.1-187.1
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“44.6”
Context: 4.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · niobiumGrade: 0.22Grade Unit: %Intercept: 15 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- niobium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 0.22
- Grade Unit
- %
- Intercept
- 15 m
- From
- 189 m
- To
- 204 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 189 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:189-204
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a solid niobium intercept over a good width with new reliable assay data, contributing to the overall understanding of the deposit, though true width is unknown and refractory issues are noted.
Positive factors
- Good grade niobium intercept over a significant width, above the stated cut-off.
- New ICP-MS assays provide reliable data.
Negative factors
- True width is not known, which may overstate the actual thickness.
- Potential for refractory niobium-bearing phases to cause incomplete digestion and conservative grade reporting.
Evidence · table
“0.22”
Context: 15.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · rare_earthsGrade: 1558Grade Unit: ppmIntercept: 15 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- rare_earths
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 1558
- Grade Unit
- ppm
- Intercept
- 15 m
- From
- 189 m
- To
- 204 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 189 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:189-204
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This is a good rare earth intercept over a good width, supporting the polymetallic nature of the deposit, with new reliable assay data, though true width is unknown.
Positive factors
- Significant rare earth (TREO) intercept over a good width, indicating potential for co-product recovery.
- New ICP-MS assays provide reliable data for rare earth distribution.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“1,558”
Context: 15.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · tantalumGrade: 115.7Grade Unit: ppmIntercept: 15 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- tantalum
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 115.7
- Grade Unit
- ppm
- Intercept
- 15 m
- From
- 189 m
- To
- 204 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 189 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:189-204
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows tantalum co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Tantalum co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for tantalum grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“115.7”
Context: 15.00
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
Refractory OreRejected · negative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Reason: The JORC Table 1 mentions that digestion of refractory niobium-bearing phases may be incomplete, suggesting potential processing challenges.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: The document explicitly states that true widths are not known for the reported intercepts.
Evidence · text
“Downhole lengths; true widths not known.”
Deleterious Elements PresentRejected · negative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Reason: The JORC Table 1 mentions 'refractory niobium-bearing phases' which can indicate processing difficulties.
Evidence · text
“Digestion of refractory niobium-bearing phases may be incomplete, and reported Nb₂O₅ grades may therefore be conservative.”
MPYDD009confirms continuity of the mineralised · galliumGrade: 45.7Grade Unit: ppmIntercept: 15 mView all detailsHide details
Identity
- Hole ID
- MPYDD009
- Project
- confirms continuity of the mineralised
- Commodity
- gallium
- Region
- southern malawi
- Reported Region
- southern malawi
- Ticker
- CHW
Geometry
- Grade
- 45.7
- Grade Unit
- ppm
- Intercept
- 15 m
- From
- 189 m
- To
- 204 m
- Hole Depth
- 385.5 m
- Intercept Depth
- 189 m
Classification
- Program
- exploration
- Sample Type
- drill
- Group ID
- MPYDD009:189-204
- Mining Method
- unknown
Location
- Easting
- 770876
- Northing
- 8295165
- CRS
- WGS1984/UTM Zone 36S
- Elevation
- 645 m
- Azimuth
- 180 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- UIS Analytical Services
- QA/QC Disclosed
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards, blanks, duplicates
Deleterious
- Deleterious Flag
- Yes
Compositing
- Cutoff Grade
- 0.2
- Cutoff Unit
- % Nb₂O₅
- Dilution Disclosed
- Yes
- Max Dilution
- 4 m
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows gallium co-enrichment, which is a positive for the overall project value, with new reliable assay data, though true width is unknown.
Positive factors
- Gallium co-enrichment with niobium, adding to the polymetallic nature of the deposit.
- New ICP-MS assays provide reliable data for gallium grades.
Negative factors
- True width is not known, which may overstate the actual thickness.
Evidence · table
“45.7”
Context: 15.00
Tags used in scoring
Deleterious Elements Presentnegative
Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
Why it applies: deleterious_flag is true
Refractory Orenegative
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: the release describes refractory metallurgy
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Step-Out ExtensionRejected · positive
Mineralization extended beyond the previously known limit.
Reason: The results confirm continuity of the mineralised system across the 270 metres strike length proven to date and mineralisation remains open at depth and along strike.
Evidence · text
“Continuity across 270 metres strike: MPYDD015, the southernmost hole drilled on the Nakombe target and paired as a scissors hole with MPYDD009, confirms continuity of the mineralised system across the 270 metres strike length proven to date. Open at depth and along strike: Mineralisation remains open at depth, to the east and north, with drilling ongoing on the eastern extent, and to resume on the Nakombe North target in 2027 (Figure 1).”
QA/QC DisclosedRejected · positive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Reason: The release explicitly states that QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.
Evidence · text
“QAQC programme included insertion of certified reference materials (CRMs), blanks and duplicates at regular intervals (~1:20), together with internal laboratory QC by UIS Analytical Services.”
Compositing TransparentRejected · positive
Cut-off grade and internal dilution rules are clearly stated for reported intervals.
Reason: The release clearly states the cut-off grade of 0.2% Nb₂O₅, minimum 4 m width, and up to 4 m consecutive internal dilution for significant intercepts.
Evidence · text
“Intervals reported at a 0.2% Nb₂O₅ cut-off, minimum 4 m width, up to 4 m consecutive internal dilution; 'incl' at 0.3% Nb₂O₅.”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.