AKM: Quarterly Activities/Appendix 5B Cash Flow Report
Original announcement by asx on
- Company
- Aspire Mining Limited
- Ticker
- AKM
- Exchange
- ASX
- Region
- Khuvsgul, Mongolia
- Primary commodity
- Coal
- Secondary commodities
- None reported
- Document categories
- Capital raise, Resource update
- Extracted
- 2026-10-30 01:11:34 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Aspire Mining Limited reconfirmed its JORC (2012) compliant Ovoot Coking Coal Project's Total Coal Reserve of 130.1 Mt, effective March 31, 2026, supporting a 31-year mine life and strong economics. The company successfully launched the Ovoot Bond program on the Mongolian OTC market, raising US$11.2 million to fund project development, which includes significant progress on CHPP and ERT infrastructure. Despite positive project advancements, the company faces ongoing cash outflows and requires further financing to complete development, with an estimated 1.8 quarters of funding available.
Reasoning: Aspire Mining Limited reported significant progress in funding and developing its Ovoot Coking Coal Project, including a successful initial bond issuance and reconfirmation of substantial JORC compliant reserves. However, the company faces a short funding runway and requires additional financing to complete the project, with a portion of the production target based on less confident Inferred Resources.
Positive factors
- Successful initial bond issuance for project development
- Reconfirmed JORC compliant coal reserves and resources
- Positive economic evaluation (NPV10 of US$1.48 billion, IRR of 60%)
- Significant progress on CHPP and ERT infrastructure development
Negative factors
- Low estimated quarters of funding available (1.8 quarters)
- Reliance on further bond placements and financing to complete project development
- Production target underpinning forecast financial information is 12% derived from Inferred Coal Resources, which have a low level of geological confidence
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 12

Classification and evidence
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The resource and reserve estimates are explicitly stated as JORC (2012) compliant.
Evidence · text
“JORC (2012) compliant Total Coal Resource of 219.4 Mt and Total Coal Reserve of 130.1 Mt”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The document refers to 'Competent Persons’ findings' in relation to the JORC compliant estimates, implying sign-off by a qualified person.
Evidence · text
“The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original announcement.”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document provides an 'Updated JORC (2012) Coal Reserve estimate' and reconfirms the Total Coal Resource.
Evidence · text
“Ovoot Coal Reserve Update: Updated JORC (2012) Coal Reserve estimate, effective 31 March 2026, reconfirmed a Total Coal Reserve of 130.1 Mt”
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The updated reserve estimate includes 76.8 Mt of Proved Coal Reserves.
Evidence · text
“comprising 76.8 Mt Proved”
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The updated reserve estimate includes 53.3 Mt of Probable Coal Reserves.
Evidence · text
“and 53.3 Mt Probable Coal Reserves”
Capital Raisepositive · Story-specific tag
No canonical definition is currently available.
Why it applies: The company launched the Ovoot Bond program and raised US$11.2 million.
Evidence · text
“Ovoot Bond Launched on Mongolian OTC Market: US$11.2 million raised across ten tranches as at 28 October 2026”
Financing Securedpositive · Story-specific tag
No canonical definition is currently available.
Why it applies: US$11.2 million has been raised through the Ovoot Bond program.
Evidence · text
“US$11.2 million raised across ten tranches as at 28 October 2026”
Funding Shortfallnegative · Story-specific tag
No canonical definition is currently available.
Why it applies: The estimated quarters of funding available is 1.8, indicating a need for further financing.
Evidence · text
“8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3) 1.8”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The production target underpinning the forecast financial information is approximately 12% derived from Inferred Coal Resources, which have a low level of geological confidence.
Evidence · text
“The production target underpinning the forecast financial information is approximately 12% derived from Inferred Coal Resources. There is a low level of geological confidence associated with Inferred Mineral Resources”
Extracted facts
Stored fact records: 7. Some facts used in scoring do not have a stored record.
Resource Estimates (7)
OvootOvoot Coking Coal Project · coalTonnes: 219400000View all detailsHide details
Identity
- Project
- Ovoot Coking Coal Project
- Commodity
- coal
- Region
- mongolia
- Reported Region
- Khuvsgul, Mongolia
- Ticker
- AKM
Resource scope
- Estimate type
- resource
- Effective date
- 2026-03-31T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Resource group id
- resource:b10c9ec1510434e3a59e
- Deposit or zone
- Ovoot
Resource Data
- Tonnes
- 219400000
Prior Estimate
- Resource Date
- 2026-03-31
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-30T00:00:00.000Z
Reasoning: The total coal resource of 219.4 Mt for the Ovoot Coking Coal Project has been reconfirmed as JORC (2012) compliant, providing a solid foundation for the project.
Positive factors
- Large total coal resource reconfirmed
- JORC (2012) compliant
Evidence · text
“JORC (2012) compliant Total Coal Resource of 219.4 Mt”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
OvootOvoot Coking Coal Project · coalTonnes: 130100000View all detailsHide details
Identity
- Project
- Ovoot Coking Coal Project
- Commodity
- coal
- Region
- mongolia
- Reported Region
- Khuvsgul, Mongolia
- Ticker
- AKM
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-03-31T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Resource group id
- resource:5d89eb6aa8aaea82e16b
- Deposit or zone
- Ovoot
Resource Data
- Tonnes
- 130100000
Prior Estimate
- Resource Date
- 2026-03-31
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-30T00:00:00.000Z
Reasoning: The reconfirmed Total Coal Reserve of 130.1 Mt is JORC (2012) compliant and supports a long mine life, indicating strong project viability.
Positive factors
- Large total coal reserve reconfirmed
- JORC (2012) compliant
- Supports a 31-year mine life
Evidence · text
“Total Coal Reserve of 130.1 Mt, reconfirmed in September 2026”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
provenOvoot Coking Coal Project · coalTonnes: 76800000View all detailsHide details
Identity
- Project
- Ovoot Coking Coal Project
- Commodity
- coal
- Region
- mongolia
- Reported Region
- Khuvsgul, Mongolia
- Ticker
- AKM
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-03-31T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Resource group id
- resource:f8dce3a66171fa39878c
- Deposit or zone
- Ovoot
Resource Data
- Category
- proven
- Tonnes
- 76800000
Prior Estimate
- Resource Date
- 2026-03-31
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-30T00:00:00.000Z
Reasoning: The reconfirmed Proved Coal Reserve of 76.8 Mt provides a high-confidence portion of the overall reserve.
Positive factors
- Significant Proved Coal Reserve reconfirmed
- JORC (2012) compliant
Evidence · text
“76.8 Mt Proved”
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
probableOvoot Coking Coal Project · coalTonnes: 53300000View all detailsHide details
Identity
- Project
- Ovoot Coking Coal Project
- Commodity
- coal
- Region
- mongolia
- Reported Region
- Khuvsgul, Mongolia
- Ticker
- AKM
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-03-31T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Resource group id
- resource:59c59725826371ef5a88
- Deposit or zone
- Ovoot
Resource Data
- Category
- probable
- Tonnes
- 53300000
Prior Estimate
- Resource Date
- 2026-03-31
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-30T00:00:00.000Z
Reasoning: The reconfirmed Probable Coal Reserve of 53.3 Mt adds to the overall confidence in the project's economic viability.
Positive factors
- Substantial Probable Coal Reserve reconfirmed
- JORC (2012) compliant
Evidence · text
“and 53.3 Mt Probable Coal Reserves”
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
OvootOvoot Coking Coal Project · coalTonnes: 97900000View all detailsHide details
Identity
- Project
- Ovoot Coking Coal Project
- Commodity
- coal
- Region
- mongolia
- Reported Region
- Khuvsgul, Mongolia
- Ticker
- AKM
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-03-31T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Resource group id
- resource:9e24469da2a3b0a0ac02
- Deposit or zone
- Ovoot
Resource Data
- Tonnes
- 97900000
Prior Estimate
- Resource Date
- 2026-03-31
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-30T00:00:00.000Z
Reasoning: The reconfirmed Marketable Coal Reserve of 97.9 Mt indicates a significant portion of the reserve is available for sale.
Positive factors
- Large Marketable Coal Reserve reconfirmed
- JORC (2012) compliant
Evidence · text
“Marketable Coal Reserve of 97.9 Mt”
Tags used in scoring
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
provenOvoot Coking Coal Project · coalTonnes: 60000000View all detailsHide details
Identity
- Project
- Ovoot Coking Coal Project
- Commodity
- coal
- Region
- mongolia
- Reported Region
- Khuvsgul, Mongolia
- Ticker
- AKM
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-03-31T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Resource group id
- resource:f747416b5f1d887d841e
- Deposit or zone
- Ovoot
Resource Data
- Category
- proven
- Tonnes
- 60000000
Prior Estimate
- Resource Date
- 2026-03-31
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-30T00:00:00.000Z
Reasoning: The reconfirmed Marketable Proved Coal Reserve of 60.0 Mt provides a high-confidence portion of the marketable reserve.
Positive factors
- Significant Marketable Proved Coal Reserve reconfirmed
- JORC (2012) compliant
Evidence · text
“60.0 Mt Proved”
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
probableOvoot Coking Coal Project · coalTonnes: 37900000View all detailsHide details
Identity
- Project
- Ovoot Coking Coal Project
- Commodity
- coal
- Region
- mongolia
- Reported Region
- Khuvsgul, Mongolia
- Ticker
- AKM
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-03-31T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Resource group id
- resource:e14bf3b659f3400a6db3
- Deposit or zone
- Ovoot
Resource Data
- Category
- probable
- Tonnes
- 37900000
Prior Estimate
- Resource Date
- 2026-03-31
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-30T00:00:00.000Z
Reasoning: The reconfirmed Marketable Probable Coal Reserve of 37.9 Mt adds to the overall confidence in the marketable reserve.
Positive factors
- Substantial Marketable Probable Coal Reserve reconfirmed
- JORC (2012) compliant
Evidence · text
“37.9 Mt Probable”
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.