Aclara Resources and Argonne National Laboratory Complete The First Phase of Developing A Digital Twin For Heavy Rare Earths Separation
Original announcement by jmn on
- Company
- Aclara Resources Inc.
- Ticker
- ARA
- Exchange
- TSX
- Region
- Louisiana
- Primary commodity
- Rare earths
- Secondary commodities
- Yttrium, Gadolinium
- Document categories
- Metallurgy, Other
- Extracted
- 2026-11-02 12:25:55 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Aclara Resources has completed the first phase of developing a digital twin for its Project Dynamo rare earth separation facility in collaboration with Argonne National Laboratory. The validated steady-state model, calibrated with demonstration plant data, will now be extended into a dynamic, AI-supported digital twin under the U.S. Department of Energy's Genesis Mission.
Reasoning: The successful development of a validated steady-state model for complex rare earth separation is a significant technical de-risking milestone for Project Dynamo.
Positive factors
- successful completion of steady-state model
- validation using real operating data
- selection for DOE Genesis Mission
- potential for reduced technical risk and lower operating costs
Negative factors
- Phase II award is subject to DOE evaluation with no assurance
Facts used in scoring: 1

Classification and evidence
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: The process involves a network of 478 interconnected mixer-settler stages using solvent extraction.
Evidence · text
“designed as a network of 478 interconnected mixer-settler stages in which the individual rare earth elements are separated by solvent extraction”
Single Domain Onlynegative
Testing limited to one composite or domain — representativeness not established.
Why it applies: only one composite was tested
Extracted facts
Stored fact records: 1. Some facts used in scoring do not have a stored record.
Metallurgical Results (1)
steady-state modellingProject Dynamo · rare_earthsView all detailsHide details
Identity
- Project
- Project Dynamo
- Commodity
- rare_earths
- Region
- louisiana
- Reported Region
- Louisiana
- Ticker
- ARA
Test Work
- Program Status
- detailed
- Test Type
- steady-state modelling
- Processing Route
- solvent extraction
- Sample
- Project Dynamo separation circuit (478 interconnected mixer-settler stages)
Lab
- Laboratory
- Argonne National Laboratory
- Consultant
- Argonne National Laboratory
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-02T00:00:00.000Z
Reasoning: Successful validation of a complex circuit model using real-world demonstration plant data.
Positive factors
- validated using operating data from demonstration plant
- predicts concentration of each rare earth element in every stage
Evidence · text
“developed and validated a steady-state model of the rare earth separation process for Project Dynamo”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.